ML19253B576

From kanterella
Jump to navigation Jump to search
Forwards LER 79-075/03L-0
Date released: 09/24/2019 Download: ML19253B576


LER 79-075/03L-0:on 790915,during Normal Operations,Drywell Equipment Drain Sump Flow Integrator Observed Not Operating While Sump Was Pumped Down Due to Blown Fuse in Integrator Current Power Supply.Fuse Replaced & Sys Tested
ML19253B582
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/12/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B582 (2)
Forwards LER 79-075/03L-0
ML19253B574
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/12/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B574 (1)