ML19253B512
| ML19253B512 | |
| Person / Time | |
|---|---|
| Issue date: | 10/05/1979 |
| From: | Menczer W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | |
| Shared Package | |
| ML19253B513 | List: |
| References | |
| CON-FIN-B-1156, CON-NRC-03-77-161, CON-NRC-3-77-161 NUDOCS 7910160335 | |
| Download: ML19253B512 (1) | |
Text
_
d-CC" C
"# 8 E NRC FCRM 255 NRC-03-77-161 CIVISICN OF CCNTR ACTS MCCIFICATION NU*ABE R U.S. NUCLE AR REGULATORY CCMMISSION W ASHINGTON, D.C. CC555 CNEW O YOOtFICATION OTHE R (Specdvl NOTIFICATION OF CONTRACT EXECUTION CCNWCT S ASED ON-Frank Schroeder, Act?ng Director AUTHORIZ ATION NUMSER To:
f j
NIPA #14 G.
NRR letter cATE 9/13/77 Division of Systems Safety, NRR
/,! '
fMCGaRfst;on) t.
//a.
/ ^s ys'^=s%r s~
WilTlam B.f!enczer
~
-O' 'OCT 0 51979 CCNTRACT CH ANGES PE R THIS ACTICN
'W*'c-
/
F R OM:
(Contract Spec:anst)
(Datel Firm fixed price modification for delivery of final report Technical Assistance Contracts Branch by 12/17/79.
DIVislON OF CONTRACTS, ADM CCN TR ACTO R IName & L ocar,on)
EXECUTION CATE OCT 0 51979 SRI International Menlo Park, Ca.lifornia 7 pgggc,,y7g,q7 Cost-PTus-F1xed-Fee PERIOD OF PERFCRM ANCE PROJECT TITLE Technical Assistance on Resistance Ductility of 2-Way 9/37/77 - 12/26/78 Slabs under Biaxial Tension, Bending, and Sr.,._r PRiNCiP At iNveSTIG ATOR J. A. Beck f.RC AUTHCRIZEO REPRESENTATIVE I. Sibweil R
fb_R '1,
_02-2 M1%
mwm NE7/ NRC FUNDS S --
FUNOING TOTAL FY 7.,8_ FUNDING S 63,002 TOTAL NRC OBLIG ATIONS S 63,002 GCi E :,' *. EN T D R OPE R TY A TT ACH VE N TtS).
CCNTR ACT OCCUMENT I
}
.4C ;Ca*.1:ib m ::.
n, 7910160 535
~'
1
. _ -