ML19253B512

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 6 to Technical Assistance on Resistance Ductility of Two-Way Slabs Under Biaxial Tension,Bending & Shear. Contractor:Sri Intl
ML19253B512
Person / Time
Issue date: 10/05/1979
From: Menczer W
NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML19253B513 List:
References
CON-FIN-B-1156, CON-NRC-03-77-161, CON-NRC-3-77-161 NUDOCS 7910160335
Download: ML19253B512 (1)


Text

_

d-CC" C

"# 8 E NRC FCRM 255 NRC-03-77-161 CIVISICN OF CCNTR ACTS MCCIFICATION NU*ABE R U.S. NUCLE AR REGULATORY CCMMISSION W ASHINGTON, D.C. CC555 CNEW O YOOtFICATION OTHE R (Specdvl NOTIFICATION OF CONTRACT EXECUTION CCNWCT S ASED ON-Frank Schroeder, Act?ng Director AUTHORIZ ATION NUMSER To:

f j

NIPA #14 G.

NRR letter cATE 9/13/77 Division of Systems Safety, NRR

/,! '

fMCGaRfst;on) t.

//a.

/ ^s ys'^=s%r s~

WilTlam B.f!enczer

~

-O' 'OCT 0 51979 CCNTRACT CH ANGES PE R THIS ACTICN

'W*'c-

/

F R OM:

(Contract Spec:anst)

(Datel Firm fixed price modification for delivery of final report Technical Assistance Contracts Branch by 12/17/79.

DIVislON OF CONTRACTS, ADM CCN TR ACTO R IName & L ocar,on)

EXECUTION CATE OCT 0 51979 SRI International Menlo Park, Ca.lifornia 7 pgggc,,y7g,q7 Cost-PTus-F1xed-Fee PERIOD OF PERFCRM ANCE PROJECT TITLE Technical Assistance on Resistance Ductility of 2-Way 9/37/77 - 12/26/78 Slabs under Biaxial Tension, Bending, and Sr.,._r PRiNCiP At iNveSTIG ATOR J. A. Beck f.RC AUTHCRIZEO REPRESENTATIVE I. Sibweil R

fb_R '1,

_02-2 M1%

mwm NE7/ NRC FUNDS S --

FUNOING TOTAL FY 7.,8_ FUNDING S 63,002 TOTAL NRC OBLIG ATIONS S 63,002 GCi E :,' *. EN T D R OPE R TY A TT ACH VE N TtS).

CCNTR ACT OCCUMENT I

}

.4C ;Ca*.1:ib m ::.

n, 7910160 535

~'

1

. _ -