Submits Interim Rept on Status of Installed Hilti drop-in Anchors Which Did Not Meet Tension Testing Requirements
Date released: 09/24/2019 Download: ML19253B016


Potentially Reportable Deficiency Re drop-in Anchors.Nine Out of 32 drop-in Anchors Tested Utilizing Four Sizes Have Failed.Investigation Underway.Next Rept to Be Issued by 791002
ML19253B018
Person / Time
Site: Midland
Issue date: 08/21/1979
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19253B018 (6)
Submits Interim Rept on Status of Installed Hilti drop-in Anchors Which Did Not Meet Tension Testing Requirements
ML19253B015
Person / Time
Site: Midland
Issue date: 09/12/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19253B015 (1)