Submits Interim Rept on Status of Installed Hilti drop-in Anchors Which Did Not Meet Tension Testing Requirements
ML19253B015
Person / Time
Site: Midland
Issue date: 09/12/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19253B016 List:
References
HOWE-247-79, NUDOCS 7909140370
Download: ML19253B015 (1)


Text

~

4 - % C0!13Um0TS

, W

^., I I P0"!Si

~

1'O M// g

$*sphen H. Howell Sinior Vice Presslent General Of fices: 1945 West Parnall Road, Jackson, Michigan 49201 + (517) 7884453 September 12, 1979 Hove-247-79 Mr J G Keppler, Regional Director Office of In::pection and Enforcement US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND 1."JOLSAR PLANT -

UNIT No 1, DOCKET No 50-329 UNIT NO 2, DOC EP No 50-330 DROP-Di ANCHORS In accordance with the requirements of 10 CFR 50 55(c), this letter constitutes en interim report on the status of installed Hilti Drop-In Anchors which diu not meet the tension testing requirements.

The ettechtents to this letter provide a description of the discrepancy, potential safety implications, investigation and planned corrective actions.

Another report, either interim or final, vill be sent en or before October 12, 1979 9

3 _ wo WRB/lb Enclosurec:

1.

Quality Assurance Program, Manegement Corrective Action Report, MCAR-1, Report 34, dated August 21, 1979 2.

Letter, J A Dutgers to G S Keeley, MCAR-34 Interim Report fl, dated September 5, 1979 CC: Director of Office of Inspection & Enforcement Att: Mr Victor'Stello, USNR0 (15) rector, Office of Mancgement h

Information & Progrc: Control,USNRC(1)