ML19253B015
| ML19253B015 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 09/12/1979 |
| From: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19253B016 | List: |
| References | |
| HOWE-247-79, NUDOCS 7909140370 | |
| Download: ML19253B015 (1) | |
Text
~
4 - % C0!13Um0TS
, W
^., I I P0"!Si
~
1'O M// g
$*sphen H. Howell Sinior Vice Presslent General Of fices: 1945 West Parnall Road, Jackson, Michigan 49201 + (517) 7884453 September 12, 1979 Hove-247-79 Mr J G Keppler, Regional Director Office of In::pection and Enforcement US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND 1."JOLSAR PLANT -
UNIT No 1, DOCKET No 50-329 UNIT NO 2, DOC EP No 50-330 DROP-Di ANCHORS In accordance with the requirements of 10 CFR 50 55(c), this letter constitutes en interim report on the status of installed Hilti Drop-In Anchors which diu not meet the tension testing requirements.
The ettechtents to this letter provide a description of the discrepancy, potential safety implications, investigation and planned corrective actions.
Another report, either interim or final, vill be sent en or before October 12, 1979 9
3 _ wo WRB/lb Enclosurec:
1.
Quality Assurance Program, Manegement Corrective Action Report, MCAR-1, Report 34, dated August 21, 1979 2.
Letter, J A Dutgers to G S Keeley, MCAR-34 Interim Report fl, dated September 5, 1979 CC: Director of Office of Inspection & Enforcement Att: Mr Victor'Stello, USNR0 (15) rector, Office of Mancgement h
Information & Progrc: Control,USNRC(1)
O i(
W Q
ON4 J un()'4 3 3.
.' D g gM 0~570 t
d
,