05000346/LER-1979-089-03, /03L-0:on 790811,single Failure Analysis Sys Channel 2 Containment Radiation Detector Re 2005 Spiked & Tripped Bistable.Re 2005 Declared Inoperable.Caused by Vibration in Area of Detector

From kanterella
(Redirected from ML19253A853)
Jump to navigation Jump to search
/03L-0:on 790811,single Failure Analysis Sys Channel 2 Containment Radiation Detector Re 2005 Spiked & Tripped Bistable.Re 2005 Declared Inoperable.Caused by Vibration in Area of Detector
ML19253A853
Person / Time
Site: Davis Besse 
Issue date: 09/06/1979
From: Eldred D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19253A852 List:
References
LER-79-089-03L, LER-79-89-3L, NP-33-79-103, NUDOCS 7909110541
Download: ML19253A853 (3)


LER-1979-089, /03L-0:on 790811,single Failure Analysis Sys Channel 2 Containment Radiation Detector Re 2005 Spiked & Tripped Bistable.Re 2005 Declared Inoperable.Caused by Vibration in Area of Detector
Event date:
Report date:
3461979089R03 - NRC Website

text

u.S. NUCLE AR REGULATORY COMMISSION NRC FORM 366 (7-77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

N Pl F -] 0l 3l g 4 1l1l1l1l@

l [g

~ lo ltl l0 lH lD B l S l 1 gl 0 l 0l -] 0] O 7

8 9 LICENSEE CODE 14 15 LICENSE NW.*6EH 23 26 LICEME T)PE JO 57 LAI 68 1 l1 l7 l9 @l0 l9 l0 l6 l7 l9 l(j CON'T i L lg l5l0l-l0l3l4l6 glgjg

~

"EPOR o

_ 7 8

60 61 DOCKET NUYBER od 63 EVENT DATE 14 h

HEPORT DATE 80 SO gC EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 1979 at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, SFAS Channel 2 Containment Radiation Detector RE 2004

- l o [ 2 l l On, August 11, RE 2005 was declared inopera-l l o 131 i spiked (tripping the bistable) and returned to nomal.

and the unit was placed in the Action Statement of T.S. 3.3.2.1.b.9 which requireq l o 14 l lble, lall four instrument strings operable in all modes. The SFAS Channel 2 Containment l

~

o s

l Radiation Bistable was lef t in the tripped state.

There was no danger to the health l

o e

The radiation mor'toring instrument l land safety of the public or to station personnel.

o 7

(NP-33-79-103) l strings associated with the other three SFAS channels were operable.

a g

80 7

8 9 COVP.

VALVE SYSTEM

CAUSE

CAUSE CODE CODE SU9 CODE COMPONENT CODE SUBCODE SUBCOCE g

Z l@

[@ lIjNlSjTlRlUj@

E lI j B j@ lE l@

E O 9 7

8 9

10 11 12 13 18 19 20 REVISION SE QU E NT I A L oCCUARENCE REFORT EVENT YE AP REPORT NO.

CODE TYPE P.

@ RE l7 9l l-dj8l9 l/l 1 013l lL l l_l l

l LE R 'RO 23 22 23 24 26 27 28 29 2U 31 JJ T KEN ACT C O PLANT ET HOURS S B IT D FOR ts.

S PPLIE MAN FA TURER lC ]Ql Fl@

]Z@

l Z l@

l Ol 0l 0 0l lY @

lYl@

lNl@

Vl1l1l5l@

33 34 25 Ju 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS

_ l 3 l o l lThe spiking was attriiuteci to vibration in the area of the detector which causes flex-l g,gij ling of the ion chamber connectors to the high and low range boards. Victorcen indi-

]

A new detector

-,,,,, j cates this can generate a small voltage which would cause the spiking.

15, 1979, and the unit re-l

,, y 3 g g was calibrated and installed per m'0-IC-383-79 on August Investigations are continuing.

g, g l moved f rom the Action Statement.

,3 80 7

8 9 ST S

% POWER OTHER STATUS DISCO RY DISCOVERY DESCRIPTION 1l 0 l 0 @] NA

]

AlglOperatorobservation i

s ACTIVITY CONTENT LOCATION oF RELE ASE RELE ASED OF RELE ASE AVOUNT oF ACTIVtTY gZl lNA l

l NA l

1 6 80 44 45 7

8 9 10 11 PERSONNEL EXPOSURES 8F4 TYPE CE SC RIPTION N^

l NU"010 l@l Z I@l T TTI 10 1 PERSONNE L INjuRI ES a:a T+.or q

Nuv8ER DESCRIP TION d ' d d>

l 0 l 0 l 0 @l NA 1 R 7

8 9 11 12

'7,S 0' 0"l3y^,jE To FACILITY

^

l 7 g o

L'hJ LzJ@l NA 80 7

8 9 10 N R C US E ON L V PUBLICITY 45 tS$UED@l NA i

i iiiiiiiiiii11

DESCRIPTION

LN_l 2 o bl$ b3

80. ;

7 g g g

David T. Eldred PHONE. 419-259-5000. Fvt. 217 DVR 79-128 N AN'E OF PREPARER

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POUER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-103 DATE OF EVENT: August 11, 1979 FACILITY: Davis-Besse Unit 1

\\

IDENTIFICATION OF OCCURRENCE:

Safety Features Actuation System (SFAS) Channel 2 Containment Radiation Detector RE 2005 spiked The unit was in Mode 1, with Power (m.7) = 2758, Conditions Prior to Occurrence:

and Load (Gross MWE) = 914.

Description of Occurrence: On August 11, 1979 at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, SEAS Channel 2 Contain-ment Radiation Detector RE 2005 spiked (tripping the SFAS Channel 2 Containment Radia-tion Bistable) and returned to normal.

Several spikes occurred in the fifteen minutes prior to the channel trip. Upon receiving the trip, RE 2005 was declared in-operable. This placed the unit in the Action Statement of Technical Specification radiation in-3.3.2.1.b9 which requires the operability of all four SFAS containment strument strings in all modes. The SFAS Channel 2 containment radiata.on bistable was left in the tripped state as required by the Action Statement.

The containment radiation instrument strings associated with the other three SEAS channels were opera-ble, meeting the minimum operational requirements.

Designation of Apparent Cause of Occurrence:

The tripping of SEAS Channel 2 was The cause of the caused by the spiking of Containment Radiation Detector RE 2005.

spiking has been attributed to vibration in the area of the detector waich causes flexing of the ion chamber connectors to the high and low range boards. Victorcen has indicated this flexing can generate a small voltage which would cause the spiking problem; testing in our Instrument and Control chop substantiates this.

Analysis of.0ccurrence:

There was no danger to the health and safety of the public or to station personnel. The containment radiation monitoring instrument strings associated with the other three SEAS channels were operable.

RE 2005 failed in the high (safe) direction.

Corrac.tive Action: A neu detector was calibrated and installed per MWO-IC-383-79.

SFAS Channel 2 (Containment Radiation) was declared operable at 1750 hours0.0203 days <br />0.486 hours <br />0.00289 weeks <br />6.65875e-4 months <br /> on August ST 5031.01 on RE 2005 which 15, 1979, by successful performance of Surveillance Test removed the unit from the Action Statement. Toledo Edison and Victoreen are investi-This is the first gating the addition of vibration dampening material in the detector.

detector to be moved from its original high temperature environment to stop the failures caused by high temperature. Other detectors will not be moved until this vibration problem is resolved.

LER #79-089 S373130

TOLEDO EDISON COMPAhT DeWIS-bESSE NUCLEAR POWER STATION L"11T ONE PAGE 2 SUPPLEME'4TAL INFOR'!ATION FOR LER NP-33-79-103 Feilure Data.

Previous failures of RE 2005 have been reported in Licensee Event Report NP-33-78-140 and NP-33-79-92.

LER 079-089 9~%. <,,

u O n' '.J '9, L J