Forwards LER 79-065/01T-0
Date released: 09/24/2019 Download: ML19253A832


LER 79-065/01T-0:on 790823,during Hanger Surveillance,Piping Section in Plant Instrument Air Sys Was Found Not to Be Seismically Supported Per Original Design.Caused by Failure to Install Proper Hanger.Proper Hanger Installed