ML19253A821

From kanterella
Jump to navigation Jump to search
Forwards LER 79-075/03L-0
Date released: 09/24/2019 Download: ML19253A821


LER 79-075/03L-0:on 790807,reactor Protection Sys Channel D High Flux Bistable Did Not Trip Respective Channel.Caused by Failed Bistable Relay Assembly.Relay Assembly Replaced & Channel Returned to Svc
ML19253A822
Person / Time
Site: Crystal River 
Issue date: 08/30/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253A822 (2)
Forwards LER 79-075/03L-0
ML19253A820
Person / Time
Site: Crystal River 
Issue date: 09/06/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253A820 (1)