ML19253A813

From kanterella
Jump to navigation Jump to search
Forwards LER 79-076/03L-0
Date released: 09/24/2019 Download: ML19253A813


LER 79-076/03L-0:on 790814,determined That Containment Gas Chromatograph Could Not Be Calibr.Caused by Internal Failure of Thermoconductivity Detector.Another Detector Renewed, Satisfactorily Tested & Returned to Svc on 790828
ML19253A815
Person / Time
Site: Crystal River 
Issue date: 09/04/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253A815 (2)
Forwards LER 79-076/03L-0
ML19253A812
Person / Time
Site: Crystal River 
Issue date: 09/07/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253A812 (1)