TEXAS UTILITIES GENERATING COMPANY 2001 ItRYAN TOWER DALLAS, TEXAS 75201 August 27, 1979 na.cany Mr. Robert L. Baer Chief Light Water Reactors Branch No. 2 Division of Project Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555 SIIBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 SUBMITTAL OF ELECTRICAL, INSTRUMENTATION AND CONTROL DRAWINGS
Dear Mr. Baer:
In your letters of February 28, 1979, and June 20, 1979, you requested an updating of the electrical, instrumentation and control drawings listed in Section 1.7 of the Final Safety Analysis Report for Comanche Peak Steam Electric Station, Units 1 and 2.
In your letter of June 20, 1979, you also reconmended that we delay sending these drawings until the end of calendar year 1979 due to the lack of staff resources and the design status of the drawings.
Now that Argonne National Laboratory has been contracted to assist in the staff's review, the requested drawings are sub-mitted. The attachment lists the drawings being submitted and their revision status. Two (2) copies of each of the drawings are enclosed and by copy of this transmittal, one (1) copy of each of the drawings are being submitted directly to Argonne National Laboratory.
Respectfully yours, h.
R J. Ga ry RJG:skf Attachment cc:
See attached sheet g-h 7,
i t
p.
'"si 2 cou, s P,a,4?
o ~.g 5
3 u d G. s.u i
cc: ARMS D. N. Chapman A. T. Parker S. B. Burwell J. C. Kuykendall J. T. Merritt S. C. Relyea N. S. Reynolds H. R. Rock H. C. Schmidt w/1 set encl.