ML19253A731

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-278/79-13 on 790416-20.No Noncompliance Noted
ML19253A731
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/17/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19253A732 List:
References
NUDOCS 7909110083
Download: ML19253A731 (2)


See also: IR 05000278/1979013

Text

Yn

'

-

p ngg

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

",

5%

REGION I

$

.h

631 PARK AVENUE

  • '

!

KING OF PRUS$l A, PENNSYLVANI A 19406

,

%..v /

...

.JD117 ins

Docket No. 50-278

Philadelphia Electric Company

ATTN:

Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

Subject:

Inspection 50-278/79-13

This refers to the inspection conducted by Mr. R. Feil of this office on April

16-20, 1979 of activities authorized by NRC License No. DPR-56 and to the discus-

sions of our findings held by Mr. Feil with Mr. W. T. Ullrich of your staff at

Peach Bottom Nuclear Power Station, Delta, Pennsylvania.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no irana of noncompliance were observed.

In accordance with Section 2.790

  • the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulatic

. copy of this letter and the enclosed inspection

report will be placed in the tac's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

O a a e i T2

a d a.a.s J

.

7909110 ())h ff

.

.

Philadelphia Electric Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss then with you.

Sincerely,

__ v _

-

h' -

sur- -

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-278/79-13

cc w/ encl:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Warren Rich, Esquire (Without Report)

.r y ., n .-3d )a ;.o<

.

.