ML19253A528

From kanterella
Jump to navigation Jump to search
Discusses Error in 790713 Response to IE Bulletin 79-13 Re Insp of Feedwater Sys Piping
ML19253A528
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/08/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7909100214
Download: ML19253A528 (1)


Text

T/ L a

VInOINIA EI.ECTu1C AND Powen ConrANY ./

., n Ricxxwono,Vz norw zA 20261 _ .O c.O -

August 8, 1979 23 to co Mr. James P. O'Reilly, Director Serial No. 530A ,

Of fice of Inspection and Enforcement P0/FHT:ecj U. S. Nuclear Regulatory Commission Docket No. 50-339 Region II License No. CPPR-78 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

IE Bulletin 79-13 Amended Response

Dear Mr. O'Reilly:

Our July 13, 1979, letter, Serial no. 530, in response to IE Bulletin 79-13,

" Cracking in Feedwater System Piping", stated that the North Anna Unit 2 feed-water piping had been inspected on June 27, 1979. This is incorrect, as only the steam generator inlet nozzles have been inspected to date. The remaining inspection ef fort will be completed in a timely manner consistent with the requirements of the subject bulletin.

Very truly yours, b kf. % Yu L6ncjp C. M. Stallings Vice President-Power Supply and Production Operations c ., ,- n n r) s2 OU 4 '.)

0 0

'b 7909100 kly p t A acm.een