ML19253A524
| ML19253A524 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/08/1979 |
| From: | Brown S VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7909100208 | |
| Download: ML19253A524 (1) | |
Text
~f~ / C
- I h
h h,[ '
vtRGINIA ELECTRIC AND POWER COMPANY si August 8, 1979 q t uq 13 ^ 3 ' 10 Mr. Jame's P. O'Reilly, Director Serial No. 552A/070279-Office of Inspection & Enforcement PSE&C/DPB:aow:mc U.S. Nuclear Regulatory Commission Region II Docket Nos. 50-404 101 Marietta Street, Suite 3100 50-405 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Our letter of August 1,1979, Serial Number 552/070279, responded to IE Bulletin 79-14 for North Anna Units 3 and 4.
On page 2 of that letter, item A of the output documents from piping and supports stress analysis and design should have read AX rather than AK.
yfu rul
[
(
. Brown, r.
Senior Vice President-Pose Stati n Engineering an C nstruction cc: Mr. Victor Stello, Director Office of Inspection & Enforcen;ent Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation n.,. cy ;
O r:uu 4 t?
7909100 h Jb FICLAL CC