ML19253A489

From kanterella
Jump to navigation Jump to search
Ack Receipt of 790802 Final Rept Re Kulka Terminal Block Deficiency.Review Will Be Completed During Future Insp
ML19253A489
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/18/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7909100140
Download: ML19253A489 (1)


Text

Q @,/

  1. pn etc o

'o UNITED ST ATES

/

NUCLE AR REGULATORY COMMISSION

$.- k f

^n

',d' /

E REGION lli 9,

,b b

[

799 ROOSEVELT ROAD GLEN E LLYN. ILLINOIS 60137

[

AUG 1 b 1979 Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your final report dated August 2, 1979, pursuant to 10 CFR 50.55(e) regarding Kulka Terminal Block Deficiency. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Ce.llen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney

<33, 4 - o Ud Y..h'>

7 909100 /fp g