ML19253A487

From kanterella
Jump to navigation Jump to search
Forwards Insp Procedures Utilized in Insp of Plant Operations & Preoperational Testing Programs.W/O Encl
ML19253A487
Person / Time
Site: Marble Hill
Issue date: 08/16/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Coughlin J
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 7909100133
Download: ML19253A487 (1)


Text

/* n/ t/

/

[ga arcg 'o, UNITED ST ATES 8 j*

NUCLEAR REGULATORY COMMISSION

$ / \\ky,'.. g' 7,

  • /,

REGION ill o,

h4

[

799 FlooSEVELT Ro AD

%.% s [

GLEN ELLYN, ILLINOIS 60137 August 16, 1979 Docket No. 50-546 Docket No. 50-547 Dr. James Coughlin, PhD Vice President - Nuclear Public Service of Indiana 1000 East Main Street Plainfield, Indiana 46168

Dear Dr. Coughlin:

As requested in your letter to Mr. James G. Keppler, dated May 31, 1979, attached is one copy of Inspection Procedures utilized in the inspection of plant operations and preoperational testing programs for nuclear facilities.

Please note that Sections 1 and 3 of the procedures are included but Section 2 is not.

Section 2 of the procedures are the details of sample size and specific requirements which have not been placed in the Public Document Room.

In addition, while these are the current copies at the present time, we will not attempt to maintain or provide to you updated copies as they occur.

When our inspection of your preoperational testing program begins, we will discuss this subject in more detail with you and your staff.

We trust this is responsive to your request.

Sincerely, O

R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch

Enclosure:

Inspection Procedures Manual Chapter 2513, 14 6 15 cc w/o enc 1:

R. M. Brown, Construction Project Superintendent R. C. Paulus, IE/HQ Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC

,,,,,,f TIC o d R => -

LeBoeuf, Lamb, Leiby & MacRae

'009100 /$ 3