g IP DISTRIBilTION:
MAY 141981 Docket File (5)
QAB Projects QAB Chron. rile WJohnston. DE JConway, QAB MEM3PANDUM FOR:
Robert L. Tedesco, Assistant Director for Licensing, Division of Licensing FROM:
William V. Johnston, Assistant Director for Materials &
Qualifications Engineering, Division of Engineering
SUBJECT:
REQUEST FOR SUBMITTAL OF REVISED QA PROGPAMS FOR WNP 1/4 AND WNP 3/5 In the Bouchey/Schwencer letter cated May 1,1981, Washington Public Power Supply System (WPPSS) submitted a revisad QA program description for the design and con-struction of WNP-2 for the staft's evaluation. Substantial changes both at the corporate and project offices to the organization and the QA program, including the selection of new construction management organizations, will also effect the other four projects - WNP 1/4 and WNP 3/5.
Accordingly, to assure that the revised design and construction QA programs for WNP 1/4 and WNP 3/5 remain in conformance with Appendix B to 10 CFR 53, it is requested that WPPSS submit a description of these programs, including those of their principal contractors, by July 1,1981 for staff review and acceptance.
Jim Conway (X27741) is the reviewer for the WPPSS projects in the QAB.
n/
William V. Johnston, Assistant Director for Materials & Qualifications Engineering Division of Engineering cc:
B. Faulkenberry, RV F. Miraglia 9
p D
E. Adensam g
M. Peranich g,
R. Auluck s
e' o\\-
a
'Qh J'
0) s>
p Bl oc ogogqc u\\
< e i) p-DE.;.QAB
.D
.pb:b[.
o""
" ' ~ >
^ Jnway:cg, 41'da e_s s_ _
W
__ Nohnston 5 g/81 5/}[/81 5//y/81
,m e. c m m m s.,x,4 e u e OFFICIAL RECORD COPY
DISTRIBUTION:
MAY 141981 DocketFile(5)
'QAB Projects QAB Chron. File WJohnston, DE JConway, QAB MEMORANDUM FOR:
Robert L. Tedesco, Assistant Director for Licensing, Division of Licensing FROM:
William V. Johnston, Assistant Director 1r Materials %
Qualifications Engineering, Division of Engineering
SUBJECT:
REQUEST FOR SUBMITTAL OF REVISED QA PROGRAMS FOR WNP 1/4 AND WNP 3/5 In the Bouchey/Schwencer letter dated May 1,1981, Washington Public Power Supply System (WPPSS) submitted a revised QA program description for the design and con-struction of WNP-2 for the staff's evaluation.
Substantial changes both at the corporate and project offices to the organization and the QA program, including the selection of new construction management organizations, will also effect the other four projects - WNP 1/4 and WNP 3/5.
Accordingly, to assure that the revised design and construction QA programs for WNP 1/4 and WNP 3/5 remain in confomance with Appendix B to 10 CFP, 53, it is requested that WPPSS submit a description of those programs, including those of their principal contractors, by July 1,1981 for staff review and acceptance.
Jim Conway (X27741) is the reviewer for the WPPSS projects in the QAB.
Is/
William V. Johnston, Assistant Director for Materials & Qualifications Engineering Division of Engineering cc:
B. Faulkenberry, RV F. Miraglia E. Adensam M. Peranich R. Auluck
/MtI A/
DE:.Q AB.,
D
.ph.h:'kk, l
"*4
~ Jnway,: cg,
rl:Haass, WyJohngon.
c ^" I 5g/81, 5/}//81 5/it/81
,,[,
DISTRIBUTION:
MAY I 41981 Docket File (5)
QAB Projects j
QAB Chron. File WJohnston, DE JConway, QAB MEMORANDUM FOR:
Robert L. Tedesco, Assistant Director for Licensing.
Division of Licensing FROM:
William V. Johnston, Assistant Director for Materials &
Qualifications Engineering, Division of Engineering
SUBJECT:
REQUEST FOR SUBMITTAL OF REVISED QA PROGRAMS FOR WNP 1/4 AND WNP 3/5 l
In the Bouchey/Schwencer letter dated May 1,1981, Washir.gton Public Power Supply System (WPPSS) submitted a revised QA program description for the design and con-struction of WHP-2 for the staff's evaluation.
Substantial changes both h. the corporato and project offices to the organization and the QA program, including the seie: tion of new construction management organizations, will also effect the otMr four projects - WNP 1/4 and WNP 3/5.
Accordingly, to assure that the revised design and construction QA programs for WNP l/4 and WNP 3/5 remain in conformance with Appendix B to 10 CFR 50, it is requested that WPPSS submit a description of these programs, including those of their principal contractors, by July 1,1981 for staff review and acceptance.
Jim Conway (X27741) is the reviewer for the WPPSS projects in the QAB.
Is/
William V. Johnston, Assistant Director for Materials & Qualifications Engineerina Division of Engineering cc:
B. Faulkenbcrry, 1V F. Miraglia E. Adensam M. Peranich R. Auluck ir,\\
c bnw.Qb 3
.Q
.f
- h. Is 0a' WVJohnston a mni ay:c~a
-dpBl sesi ss f
GP DISTRTBUTION:
M.AY 1 4 1981 Docket File-(5)
QAB Projects QAB Chron. File WJohnston, DE JConway, QAB MEM3RANDUM FOR:
Robert L. Tedesco, Assistant Director for Licensing.
Division of Licensing FROM:
William V. Johnston, Assistant Director for Materials &
Qualifications Engineering, Division of Engineering SUBJEC1 REQUEST FOR SUBMITTAL OF REVISED QA PROGRAMS FOR WNP 1/4 AND WNP 3/5 In the Bouchey/Schwencer letter dated May 1,1981, Washington Public Power Supply System (WPPSS) submitted a revised QA program description for the design and con-structiva of WNP-2 for the staff's evaluation.
Substantial changes both at the corporate and project offices to the organization and the QA program, including the selection of new construction management organizations, will also effect the other four projects - WNP l/4 and WNP 3/5.
Accordingly, to assure that the revised design and construction QA programs for WNP l/4 and WNP 3/5 emain in conformance with Appendix B to 10 CFR 53, it is requested that WPPSS submit a description of ttese programs, including those of their principal contractors, by Ju'y 1,1981 for staff review and acceptance.
Jim Conway (X27141) is the reviewer for the WPPSS projects in the QAB.
I3 William V. Johnston, Assistant Director for Materials & Qualifications Engineerir.g Division of Engineering cc:
B. Faulkenberry, RV F. Miraglia E. Adensam M. Peranich R. Auluck
/ /* t )
bb.5.h d.
C*
- w m eyn g..
us s.
wenon
" n F 5 jk/81 5/)l/81
,5//t./ 81
_L_
l DISTRIBUTION:
. YAY 1 41981 Docket File (5)
_QAB Projects.
Q AB Ch ron. Fi k WJohnston, DE JConway, QAB MEM3RANDUM FOR:
Robert L. Tedesco Assistant Director for Licensing, Division of Licensing FROM:
William V. Johnston, Assistant Director for Materials &
Qualifications Engineering, Division of Engineering
SUBJECT:
REQUEST FOR SUBMITTAL OF P2 VISED QA PROGRAMS FOR KNP 1/4 AND WNP 3/5 In the Bouchey/Schwencer letter dated May 1,1981, Washington Public Power Supply System (WPPSS) submitted a revised QA program description for the design and con-struction of WNP-2 for the staff's evaluation.
Substantial changes both at the corporate and project offices to the organization and the QA program, including the selection of new construction management organizations, will also effect the other four projects - WNP l/4 and WNP 3/5.
Accordingly, to assure that the revised ocsign and construction QA programs for WNP 1/4 and WNP 3/5 remain in conformance with Appendix B to 10 CFR 53, it is requested that WPPSS submit a description of th>se programs, including those of their principal contractors, by July 1,1981 for staff review and acceptance.
Jim Corniay (X27741) is the reviewer for the WPPSS projects in the QAB.
Isl William V. Johnston, Assistant Director for Materials & Qualifications Engineering Division of Engineering cc:
B. Faulkenberry, RV 1
F. Mira9 1a E. Adensam M. Peranich R. Auluck i
<e,)
in bb,k..
.l
. h. s b.
5
' ""' 4
~ @way.:cg.
i Ha_ css __
_ VJohnston
.i.
W 5g/81 5/l[/81 5//g/81
.[,
'"4