U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.
99900366/79-01 Program No. 51400 Company:
ESB Incorporated Exide Power Conversion Division 3301 Spring Forest Road Raleigh, North Carolina Inspection Cond3cted:
June 11-14, 1979 i
/!
Inspector:
E,
[C'hh-7f W. E W er, Contractoflnspector, Vendor Date Inspection Branch
/
k V
g ~te3~7f Approved by:
Ch'ieffyComponentsSectionII, D. M.MigAni" cutt, Da Vendor Inspection Branch Summary:
Inspection on June 11-14,1979 (99900366/79-01).
Areas Inspected:
Implementation of 10 CFR 50, Appendix B criteria, and applicable codes and standards, including organization; quality assurance program; change control; and manufacturing process control.
The initial management meeting was also conducted.
The inspection involved twenty-six (26) inspector-heurs on site.
Results:
In the four (4) areas inspected, no deviations or unresolved items were identified in three (3) areas. The following deviations and unresolved item were identified in the remaining area:
Deviations: Change Control-Practices were not consistent with 10 CFR 50, Appendix B, and the Quality Control Procedures Manual commitments (Notice of Deviation, Items A. and B.)
1406 057
,y gn 280 3 d Unresolved Item: Change Control-The inspector was unable to determine that distribution of Change Notices and retrieval of obsolete drawings by Quality Control had been conducted in accordance with established procedures (Details Section, paragraph E.3.b.).
,. ~
, t ah 'A '
I