%e UNITED STATES 3

(g 8'

NUCLEA? REGULATORY COMMISSION g

3 e

t MM NGTON, D. C. 20555 k

C OtRk October 26, 1979 CHAIRMAN The Honorable Jack Brooks Chainnan Committee on Government Operations U. S. House of Representatives Washington, D. C.

20515

Dear Mr. Chainnan:

Your letter of August 8,1979 asked for the Comission's response to a number of conclusions and recomendations in the Comittee's report, -Emergency Planning Around U.S. Nuclear Powerplants: Nuclear Regulatory Concission Oversight." The report focuses on many significant elements of NRC's emer-gency planning responsibil,ities and suggests changes in our current process.

Although we have initiated several actions to determine how emergency planning should be improved, most key emergency planning issues are as yet unresolved.

Therefore, I must give you an interim response to your letter.

On July 17, we issued an Advance Notice of Proposed Rulemaking on 14 emergency planning issues that pertain to many of your Comittee's recomendations (see ). For example, the Comission is 5.:. eking public coment on what should be the basic objectives of emergency planning, what constitutes effec-tive emergency response plans for State and local agencies and for NRC licensees, should NRC concurrence in the associated State and local emergency response plans be a requirement for nuclear reactor operation, should radiological emergency response drills be required, and how and to what extent should the public be infomed. In addition, the Comission has asked for public coments on the recommendations of NRC/ EPA task force report addressing emergency plan-ning zones (Enclosure 2). More specifically, the report suggests using generic Emergency Planning Zones for plume and ingest 1on exposure pathways as a plan-ning basis for State and local emergency response plans. On October 18, the Commission issued its policy statement on the report (Enclosure 3).

We also established a task force on emergency planning to identify and analyze problems with NRC's current emergency planning process. The task force identi-fied 30 problems in the areas of responsibility and authority, the planning process, regulations and guidance, licensing, implementation, and testing and verification capability. The task force report (Enclosure 4) contains specific office tasks to help resolve these problems. Office tasks involve short-tenn actions, some of which are undemay, and long-tenn actions that form the basis for developing a comprehensive long-range plan for all of NRC's emergency preparadness activities.

1395 139

  1. e\\1

,2 The Honorable Jack Brooks Our future emergency planning program will be greatly influenced by the resolution of the above issues.

In particular, we will closely study all public coments we receive from the rulemaking notice and on the NRC/ EPA report.

In addition, as a result of the NRC task force report, we have asked our staff to evaluate the organizational aspects of emergency planning at NRC.

All of these things, taken with your Committee's recomendations, will help us upgrade our emergency planning activities.

Finally, I have sumirarized in Enclosure 5 ongoing NRC activities that are specifically related to your reconnendations but not directly dependent on the outcome of public coments. It is, of course, our intent to keep all interested Comittees in the Congress well informed of major changes that will upgrade our emergency planning program.

I hope this information conveys to you the importance and priority we are placing on our emergency planning program.

g Sincerely, WPO ph M. Hendrie

Enclosures:

1.

Advance Notice of Proposed Rulemaking 2.

NRC/ EPA Task Force Report 3.

NRC Policy Statement 4.

Initial Report of NRC Task Force on Emergency Planning 5.

NRC Activities Underway cc: The Honorable Toby Moffett a

1395 140

...m

i NRC f.ctions Underway Related to.

Recomendations of the Environment, Enerov and Natural Resources Subcomittee Readiness and Leadershio RECO.tENDATIONS: iiake emergency planning position clear; imvolve Comission more directly; determine sufficient resoumees.

Spurred by the Three liile Accident, the Comission has made < emergency planning a high priority item and has taken the following steps for iimediate improvement.

1.

Established, in June 1979,' a task force to examine NRCs current emergency planning process and outline an approach for improvementt.

2.

On July 17,1979, issued for comment an: Advance Notice c7f Proposed Rulemaking regarding, among other things, NRC concurred'.in State and local plans as a requirement for power reactor operatiam.

3.

k' rote to Governor of each State with or contiguous to aIperating nuclear power plants where there are no adequate State plans tc: wrge their i nediate attention to this area and to offer our assissnce in developing an appropriate plan.

4 Increased resources through temporary assignmentrto the::0ffice of State Programs for the remainder of FY 1979 and requested addittional permanent positions in our FY 1980 budget supplemental.

D"*

'T C:ility Plans

E C?"'.E"C ATIONS :

Vograde standards for emergency olanning arnd incorporate requirements into a rule that retrosoectiwely covers all operating nuclear power plants as well as all new applicants; include in customers' electric bills inferrmation on the risks of nuclear energy and planned protective actions if an accident occurs; imcreve public information procedures.

.': grading of utility plans is being carried out essentialil.y through tea'. reviews.

The staff is conducting reviews of licensee preparedness t brough team visits Oc r.uclear power plant sites and will evaluate opdated facility plans against 1395 141

2-

~

Appendix E to 10 CFR Part 50 (" Emergency Plans for Production and Utilization Facilities"), Regulatory Guide 1.101 (additional guidance) and the draft acceptance criteria contained in the attachment.

The criteria have five objectives:

(1) to assure effective coordination of emergency acitvities among all organizations having a response role; (2) to assure early warning and clear instructions to the population-at-risk in the event of a serious radiological emergency; (3) to assure continued

~

assessment of actual or potential. consequences onsite and offsite; (4) to assure effective implementation of emergency measures in the environs; and (5) to assure continued maintenance of an adequate state of emergency preparedness.

,I_f Appendix E and Parts 50.33 and 50.43 are revised, it will be done in

~

conjunction with ouf rulemakihg efforts.

Depending on the outcome of public coments on the issues involved in rulemaking, the guidance will be revised to reflect more details on evacuation plans, emergency planning zones (both onsite and offsite), accident assessment, and protective and corrective measures and identification and coordination of response organizations in the event of an accident.

Proposed revisions are described more specifically in the last 14 pages of SECY 79-499.

In addition, NRC has had dedicated telephone lines installed between the NRC Incident Response Center and each reactor control room.

Auxiliary lines are expected to be installed by the end of the year.

1395 142

+

em=

em u

.a-State and Local plans

, RECOMMENDATIONS: Upgrade requirements for State and local plans and incorporate requirements into a rule that should be the basis agiinst which all State plans are reviewed; review state plans for. effectiveness, including evacuation; require a State and local plan that complies with the rule above as a condition for the issuance of a con-struction oermit and operating license; suspend all operating licenses of nuclear power plants in States where no acceptable State and local plans exist.

The staff is developing acceptance. criteria for State and local. government emergency plans. The staff is also working with the Federal Emergency Management ~ Agency (FEMA) to prepare an imprdved emergency planning guidance document for the States and local governments by June 1980.

In the interim, the staff is continuing to evaluate and reevaluate plans as part of the voluntary Federal program of assistance to State and local governments.

In addition to this in-house review of State plans, the effectiveness of these plans and the need for revisions will be determined during annual exercises that are required to maintain NRC concurrence.

Wi-hin the program for upgrading licensee's emergency plans, the response capability of local orga-nizations will be emphasized.

The acceptance criteria for upgrading plans list specific provisions that will be in the plans of local authorities.

The recormendation to promulgate a rule requiring State and local emergency plans that meet NRC standards as a precondition to issuance of a construction permit or an operating license is a valid concern.

However, our final decision on incorporating requirements into a rule will depend on the outcome of rulemaking, the comments of which we are receiving and beginning to analyze.

We expect to develop a rule by the end of the year.

1395 143

..g

~

4

.Regarding the suspension of operating licenses of nuclear power olants where there is no NRC-approved State and local emergency plans, the staff has alreak taken steps with States to help assure plans receive NRC concurrence by June 30, 1980.

Contingencies of this deadline that need to be considered are:

(1) the cooperation of the States involved and the Federal ag6ncies thtt assist the NRC in plan review and concurrence, (2) the use of existing planning guidelines and concurrence criteria, and.(3) t

~ availability of adequate staf_f in the _0ffic.e of State Programs an.he d

the NRC Regions.

~

~

~

~'

~

Planning Basis for State and Utility Plans I RECOPF.END \\TIONS :

Replace Low Population Zone with Emergency Planning Zones (EPZ's) as planning basis and require by rule State and local plans for plume and ingestion pathway EPZ's around each nuclear power plant.

The recommendations of the NRC/ EPA Task Force on Emergency Planning (NUREG-0396) includes use of EPZ's as the planning basis for guidance to State and local governments in developing emergency plans. The Commission is deferring decision on these recommendations until comments in the rulemaking proceeding are received and analyzed.

Regulations requiring use of EPZ's would likely be done in conjunction with the overall rulemaking that is expected to be ec.:leted in January 1980.

The rule would aoply to all States affected by nuclear oower plants.

In :ne interim, the acceptance criteria being used in team reviews, described earlier, provides for prompt notification and protective actions with the Erergency Planning Zones discussed in NUREG-0396.

~

D**]D D 3'l o o ju a J.1 S

=

1395 144

Nuclear Power Plant Siting RECOMMENDATIONS:

Review existing emergency response capability including evacuation feasibility; require by rule, in the licensing process, establishment of effective response capability.

Public comments have been requested on NUREG-0396 which scopes offsite emergency planning guidance.

Meanwhile, the staff is reexamining emergency response capability, particularly evacuation.

NRR has teams reviewing, on a site-by-site basis, existing licensee emergency, response capability.

Among other things, the maximum sized zone will be evaluated during their review.

Also, the teaes will cvaluate,the evacuation plan and/or other protective measures for the EPZ associated with the exposure and ingestion pathways.
Again, soecific criteria used in assessing response capability is described in detail in the attachment.

1395 145

Emergency Planning Acceptance Criteria for Licensed Nuclear Power Plants o

o g 3' }k(g mm w fu,1.

fd o INTRODUCTION j eeM Licensees will submit updated facility plans either before or after the site visit by the NRR review team, together with the appropriate State and local plans, which will be evaluated collectively.against the requ.ii:rements of Appendix E to 10 CFR Part 50, the positions set forth in Reguuatory Guide 1.101, and the acceptance criteria contained herein.

The criiteria contained herein will be used in conjunction with the aforementioned regulations and guidance to assure that the following emergency planning obje::tives have been achieved.

(1) Effective coordination of em'ergency activities among aTV organizations having a response role.

(2) Early warning and clear instructions to the population-act-risk in the event of a serious radiological emergency.

(3) Continued assessment of actual or potential consequences.both onsite and offsite.

(4) Effective implementation of emergency measures in the emvirons.

(5) Continued maintenance of an adequate state of emergency : preparedness.

It should be noted that the planning herein identified for ttne Emergency Planning Zones (NUREG-0396) need not be fully implemented at this time in order to meet the acceptance criteria.

Evaluation of the planning for the plume exposure pathway should be based on what is feasible om the time scale 1395 146

2 of these reviews with firm commitments to extend such provisions throughout the entire Emergency Planning Zone by January 1, 1981.

Also, the Commission has not yet spoken on the "50 mile" aspect of the Emergency Planning Zone associated with the ingestion pathway.

Hence, the use of the related accept-ance criteria in the.evaluaticn need not be applied to the full extent implied in NUREG-0396.

However, the plans must demonstrate that a capability exists to protect the public from exposure via the ingestion pathway.

ACCEPTANCE CRITERIA I.

To assure effective coordination of emergency activities among all organizations having a response role A.

Licensee plans will:

~

1.

Provide for an emergency coordinator at all times, including an individual onsite at the time of an accident, having the authority and responsibility to initiate any emergency actions within the provisions of the emergency plan, including the exchange of information with authorities responsible for coordinating offsite emergency measures.

2.

Provide for the augmentation of the minimum onsite emergency organization within 60 minutes for all classes of emergencies above the " alert" level.

3.

Identify and define by means of a block diagram the interfaces between and among the onsite functional areas of emergency activity, licensee headquarters support, local services support, and State and local government response organizations.

The i395 147

3 above shall include the onsite technical support center and the operational support center as disc'ussed in NUREG-0578.

4.

Describe the location and role of the onsite technical support center.

See item 3 of Section 3.3.3.b of Appendix A to NUREGJ0578 (e.g., communications with NRC and the offsite

'i emergency operations center).

5.

Describe the location and role of the onsite operational support center.

See item 3 of Section 2.2.2.c of Appendix A to NUREG-0578.

6.

Provide for the dispatch of a representative to the principal emergency operations center established by the offsite agencies (not required if licensee's offsite emergency operation center is at the same location as that described in item I.B.4).

B.

State / local plans will:

1.

Identify authorities responsible for cocrdinating offsite emergency activities for the Emergency Planning Zones discussed in NUREG-0396.

2.

Designate the authority and specific responsibility for each coordinating authority.

3.

Describe the concept of operations from the perspective of each official having a coordinating role, including the operational interrelationships of all Federal, State, and local organiza-tions providing emergency support services.

13'15 148

4 4

4.

Identify the predetermined location of the Emergency Operations Center to be used for the coordination of all offsite emergency support activities.

5.

Descrjbe the communication plan for emergencies, including titles and alternates for both ends of the communication links and the primary and backup means of communication. Where consistent with the agency function, these plans will include:

a.

Provision for prompt and assured activation of the State / local emergency response network.

b.

Provisionforadministrativecontrolmethodsforassuring effective coordination and control of Federal, State, and local emergency support activities.

c.

Provision for communications with continguous State / local governments within the Emergency Planning Zones.

d.

Provision for communications with Federal emergency response organizations.

e.

Provision for communications with the nuclear facility, State and/or local emergency operations centers, and field assessment teams.

II.

To assure early warning and clear instructions to the population-at-risk in the event of a serious radiological emergency I..

Licensee plans will:

1.

Provide an emergency classification scheme as set forth in Regulatory Guide 1.101.

1395 149

5 2.

Establish specific criteria, including Emergency Action Levels (EAL) as appropriate, for declaring each class of emergency.

a.

EALs for declaring a " site emergency" will incidde instrument readings and system status indications corresponding to an airborne fission product inventory within containment which, if released, could result in offsite doses equivalent to the lower limit of th.e EPA Protective Action Guides (PAG) l for exposure to airborne radioactive materials.

b.

EALs for declaring a " general emergency" will include instrument readings and system status indications corresponding to an airborne fission product inventory within containment which, if released, could result in offsite doses equivalent to the upper limit of the EPA Protective Action Guides (PAG) for exposure to airborne radioactive materials.

3.

Provide a clear and explicit methodology for relating EALs to PAGs.

4.

Identify the onsite capability and resources to properly assess and categorize accidents including:

a.

Instrumentation for detection of inadequate core cooling.

See item 3 of Section 2.1.3.b of Appendix A to NUREG-0578.

b.

Radiation monitors.

See item 3 of Section 2.1.8.b of Appendix A to NUREG-0578.

5.

Frovide for recommending protective actions to the appropriate State and local authorities, based qn projected dose to the population-at-risk, in accordance with the recommendation set forth in Table 5.1 of the Manual of Protective Action Guides 1395 150

6 and Protective Actions for Nuclear Incidents, EPA-520/1-75-001.

Upon declaration of a " general emergency", immediate notification shall be made directly to the offsite authorities responsible for implementing protective measures within the Emergency Planning Zone as discussed in NUREG-0396.

6.

Describe the onsite communications capability for assuring contact with the offsite authorities responsible for implementing protective measures including a primary and backup means of communications.

7.

Provide for periodic dissemination of educational information to the public within the plumeexposure Emergency Planning Zone regarding the potential warning methodology in the event of a serious accident.

B.

State / local plans will:

1.

Identify authorities having a response role within the Emergency Planning Zone as discussed in NUREG-0396.

2.

Designate the authority and specific responsibility for eacn of the responding authorities.

3.

Provide for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> / day manning of communication link by authorities responsible for implementing offsite protective measures.

4.

Provide an emergency classification scheme that is consistent with that established by the licensee.

5.

Describe the resources that will be used if necessary to provide early warning and clear instructions to the populace within the 1395 151

7 Emergency Planning Zone associated with the pilume exposure pathway (NUREG-0396) within 15 minutes followiirig notification from the facility operator (e.g., tone alert s.ystems, sirens and radio /TV).

6.

Provide for posting information regarding the ; potential warning methodology and expected response in areas vis5ted by transients within the Emergency Planning Zone (e.g., recreational areas).

7.

Identify prewritten emergency messages for restponse organizations and the public consistent with the classificatiion scheme.

8.

Provisions for testing the overall communicatis:ons link to assure that the criteria specified in item 5 ailove is met on a continuing basis.

III. To assure continued assessment of actual or potential ccmsequences both ensite and offsite D**D

  • D'3' A.

Licensee plans will:

1.

Identify the onsli,e capability and resources t:n provide valid V

and continuing assessment throughout the coursie of a,n accident including:

a.

Post-accident sampling capability.

See titem 3 of Section 2.i.8.a of Appendix A to NUREG-0578.

b.

In plant iodine instrumentation.

See item 3 of Section 2.1.8.c of Appendix A to NUREG-0578.

Plots ' showing the containment. radiation enonitor reading c.

vs. time following an accident for incideents involving i395 152

8 100% release of coolant activity,100% release of gap activity,1% release of fuel inventory, and 10% release of fuel inventory.

2.

Ident,ify the capability and resources for fielld monitoring in the environs of the plant including the additnonal dosimetry specified in the revised technical position ismsued by the NRC Radiological Assessment Branch for the Environrmental radiological monitoring program.

2 B.

. State / local plans will:

'6 l.

Identify the agencies hav'no a radiological assessment role within the Emergency Planning Zones as discusse.d in NUREG-0396, including the lead agency for data coordinatiom.

2.

Designate the specific responsibilities for each agency having an assigned assessment role.

3.

Describe the arrangements established with the ' Department of Energy Regional Coordinating Office for radioTc)gical assistance under the RAP and IRAP programs.

4.

Designate a centralized coordination center forr the receipt and analysis of all field monitoring data.

5.

Describe the methods and equipment to be emplo?yed in determining the magnitude and locations of any radiological hazards following liquid or gaseous radioactivity releases.

1395 153

9 IV.

To assure effective implementation of emergency measures in the environs A.

Licensee plans will:

e 1.

Provide written agreements with each Federal, State, rnd local agency and other support organizations having an emergency response role within the Emergency Planning Zones as discussed in NUREG-0396.

The agreements will identify the emergency measures to be provided and the mutually acceptable criteria for their implementation.

B.

State / local plans will:

1.

Designate protective action guides and/or other criteria to be used for implementing specific protective actions in accordnace with the recommendations of EPA regarding exposure to a radioactive gaseous plume (EPA-520/1-75-001) and with those of HEW /FDA regarding radioactive contamination of human food and animal feeds as published in the Federal Register of December 15, 1 978 (43 FR 58790).

2.

Designate the informational needs (e.g., dose rates, projected dose levels, contamination levels, ariborne or waterborne activity levels) for implementing the protective actions identified in item 1 above.

3.

Describe the evacuation plan and/or other protective measures for the Emergency Planning Zone asso,ciated with the plume exposure pathway (NUREG-0396) including:

1395 154

10 a.

Maps showing evacuation routes as well as relocation and shelter areas.

b.

Population and their distribution around the nuclear facility.

c.

Means for notification of all segments of the transient and resident population.

d.

Plans for protecting those persons whose mobility may be impairedduetosuchfaEtorsasinstitutionalconfinement.

e.

Provisions for the use of radioprotective drugs, particularly for emergency workers, including quantities, storage, and means of distribution.

f.

Means of effecting relocation.

g.

Potential. egress rnutes and their projected traffic capacities under emergency use.

h.

Potential impediments to use of egress routes, and potential contingency measures.

4.

Describe the protective measures to be used for the Emergency Planning Zone associated with the ingestion pathway (NUREG-0396) including the methods for protecting the public from consumption of contaminated foodstuffs.

5.

Provide for maintaining dose records of all potentially exposed emergency workers involved in response activities.

1395 155

  • f 11 V.

To assure continued maintenance of an adequate state of emergency preparedness A.

Licensee plans will:

o 1.

Provide, in addition to the drills and exercises identified in Regulatory Guide 1.101, a joint exercise involving Federal, State, and local response organizations.

The scope of such an exercise should test as much of the emergency plans as is reasonably achievable without involving full public participation.

Definitive performance criteria will be established for all levels of participation to assure an objective evaluation.

This joint test exercise will be scheduled about once every five years.

B.

State / local plans will:

1.

Provide for emergency drills and exercises to test and evaluate the response role of the agency, including provisions for critique by qualified observers.

2.

Provide for participation in the joint Federal, State, local and licensee exercise described in A.1 above.

3.

Describe the training program for those individuals havirg an emergency response assignment.

4.

Provide for periodic review and updating of the emergency response plans of the agency.

e i 395 156 em-