ML19250C416

From kanterella
Jump to navigation Jump to search
Ack Receipt of 791025 Final Deficiency Rept Re Design of Pipe Hangers.Matter Will Be Reviewed at Future Insp
ML19250C416
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/13/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7911260083
Download: ML19250C416 (1)


Text

'i~

> na

/

uq'o, UNITED STATES 8"

NUCLEAR REGULATORY COMMISSION

~,

n REGION lil 0,

[

799 ROOSEVELT ROAD

,g*

GLEN ELLYN. ILLig'8 ts 6C137 NOV 13 I9 Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your final report dated October 25, 1979, pursuant to 10 CFR 50.55(e) regarding design deficiency of pipe hangers. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, W s Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr., Attorney 1394 184 7911260 0 3 3 J