05000346/LER-1979-098-03, /03L-0:on 791004,during Component Cooling Water Monthly Test,Decay Hear Cooler 1 Component Cooling Outlet Valve CC 1467 Would Not Operate.Caused by Slippage of Valve Linkage.Linkage Realigned & Calibr

From kanterella
(Redirected from ML19250C021)
Jump to navigation Jump to search
/03L-0:on 791004,during Component Cooling Water Monthly Test,Decay Hear Cooler 1 Component Cooling Outlet Valve CC 1467 Would Not Operate.Caused by Slippage of Valve Linkage.Linkage Realigned & Calibr
ML19250C021
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/1979
From: Deakyne K
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19250C012 List:
References
LER-79-098-03L, LER-79-98-3L, NUDOCS 7911060399
Download: ML19250C021 (2)


LER-1979-098, /03L-0:on 791004,during Component Cooling Water Monthly Test,Decay Hear Cooler 1 Component Cooling Outlet Valve CC 1467 Would Not Operate.Caused by Slippage of Valve Linkage.Linkage Realigned & Calibr
Event date:
Report date:
3461979098R03 - NRC Website

text