05000346/LER-1979-097-03, /03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced

From kanterella
(Redirected from ML19250C000)
Jump to navigation Jump to search
/03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced
ML19250C000
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/1979
From: Eldred D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19250B996 List:
References
LER-79-097-03L, LER-79-97-3L, NUDOCS 7911060377
Download: ML19250C000 (2)


LER-1979-097, /03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced
Event date:
Report date:
3461979097R03 - NRC Website

text