ML19250B902
From kanterella
Jump to navigation
Jump to search
ML19250B902 | |
Person / Time | |
---|---|
Site: | Point Beach, Allens Creek |
Issue date: | 09/25/1979 |
From: | Potthoff F AFFILIATION NOT ASSIGNED |
To: | Atomic Safety and Licensing Board Panel |
Shared Package | |
ML19250B901 | List: |
References | |
NUDOCS 7911060019 | |
Download: ML19250B902 (2) | |
Similar Documents at Point Beach, Allens Creek | |
---|---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARNPL-97-0357, Comment Opposing Proposed NRC Bulletin 96-001,suppl 1, CR Insertion Problems1997-06-19019 June 1997
[Table view]Comment Opposing Proposed NRC Bulletin 96-001,suppl 1, CR Insertion Problems DD-97-15, Director'S Decision DD-97-15 Re Petitioners Request That NRC Prohibit Loading of VSC-24 Until Coc,Sar & SER Amended Following Independent third-party Review of VSC-24 Design. No Adequate Basis Exists for Granting Petitioners Request1997-06-18018 June 1997 Director'S Decision DD-97-15 Re Petitioners Request That NRC Prohibit Loading of VSC-24 Until Coc,Sar & SER Amended Following Independent third-party Review of VSC-24 Design. No Adequate Basis Exists for Granting Petitioners Request ML20141B0451997-06-0909 June 1997 Requests Extension of Comment Period for NRC Bulletin 96-001,suppl 1 Re Control Rod Insertion Problems ML20198R1511997-03-0505 March 1997 Transcript of 970305 OI Interview of Aj Cayia in Two Rivers, Wi Re NRC Investigation Case 3-97-008.Pp 1-70 ML20198R0931997-03-0404 March 1997 Transcript of 970304 OI Interview of Rj Harvey in Two Rivers,Wi Re NRC Investigation Case 3-97-008.Pp 1-28. Supporting Documentation Encl ML20198R1111997-03-0404 March 1997 Transcript of 970304 OI Interview of E Ziller in Two Rivers, Wi Re NRC Investigation Case 3-97-008.Pp 1-33.Supporting Documentation Encl ML20198R1281997-03-0404 March 1997 Transcript of 970304 OI Interview of T Malanowski in Two Rivers,Wi Re NRC Investigation Case 3-97-008.Pp 1-28 ML20198R1361997-03-0404 March 1997 Transcript of 970304 OI Interview of DF Johnson in Two Rivers,Wi Re NRC Investigation Case 3-97-008.Pp 1-37 ML20134B7371997-01-27027 January 1997 Exemption from Requirements of 10CFR50.60 to Determine That Setpoint for LTOP Events Will Not Present Undue Risk to Public & Safety.Exemption Granted NPL-95-0321, Comment on Proposed 10CFR50.54(p) Re Process for Changes to Security Plans W/O Prior NRC Approval.Supports Proposed Clarification of Language in 10CFR50.54(p)1995-07-11011 July 1995 Comment on Proposed 10CFR50.54(p) Re Process for Changes to Security Plans W/O Prior NRC Approval.Supports Proposed Clarification of Language in 10CFR50.54(p) ML20085E6541995-06-13013 June 1995 Comment Re Draft NUREG/BR-0199, Responsiveness to Public. Expresses Concern on Dry Cask Storage W/Exemption Given to VSC-24 Cask & Procedures for Unloading & Transport at Plant ML20078F4831994-12-20020 December 1994 Comment on Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Np Reactors.Informs That Util of Belief That NRC Already Has Appropriate Regulatory Authority Over Shutdown & low-power Operations,As Provided in Maint Rule ML20077E8361994-12-0101 December 1994 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low- Power Operations for Nuclear Power Reactors ML20059E9331993-10-27027 October 1993 Comment Supporting Proposed Rule 10CFR171 Re Restoration of Generic Exemption from Annual Fees for Nonprofit Educational Institutions ML20045D7331993-06-13013 June 1993 Comment on Proposed Rule 10CFR26 Re Mods to fitness-for-duty Program Requirements.Recommends That NRC re-evaluate Proposed Testing Frequency Due to Random Testing Rate of 50% Sufficient to Provide Continued Detection Effectiveness ML20127D7191992-09-0606 September 1992 Comment on Proposed Rule 10CFR72 Re Approval of Two Addl Dry Cask Storage Designs.Opposes Rule ML20127D6371992-09-0303 September 1992 Comment on Proposed Rule 10CFR72 Re Approval of Two Addl Dry Cask Storage Designs.Opposes Rule & Urges NRC to Extend Comment Period in Order for Concerned Citizens to Prepare Thorough List of Objections ML20114D2591992-08-24024 August 1992 Comment Opposing Proposed Rule 10CFR72 Re Proposal to Store Spent Nuclear Fuel in VSC-24 Storage Casks at Plant in State of Wi ML20073N1141991-05-10010 May 1991 Comment Supporting Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery ML20058D4831990-10-15015 October 1990 Comment Supporting Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal ML20235S8381989-02-22022 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Degree Requirement for Senior Reactor Operator (Sro).Unless Grandfathered in Next 4-5 Yrs Author to Be Locked Out of Job & Does Not Intend Spending 20 Plus Yrs as Reactor Operator ML20235N8341989-02-17017 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants ML20148K5591988-03-18018 March 1988 Comment Supporting Proposed Rule 10CFR50,App J Re Mass Point Method of Data Analysis.Recommends Test Duration Criteria in ANSI/ANS-56.8-1987,Section 5.4 Be Accepted in Revised Regulations ML20236Q7991987-11-0909 November 1987 Comments on Proposed Rev 2 to Reg Guide 1.100 Re Seismic Qualification of Electrical & Mechanical Equipment for Nuclear Power Plants ML20235V8231987-10-13013 October 1987 Order Imposing Civil Monetary Penalty in Amount of $50,000 Based on Violations Noted During Special Physical Security Insp on 860718-0807 ML20136E0511985-11-20020 November 1985 Memorandum & Order Granting Licensee 850826 Request for Extension of Deadline for Environ Qualification of Electrical Equipment to 860525 for Unit 1 & 851231 for Unit 2.Served on 851120 ML20137C8601985-11-19019 November 1985 Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 ML20138M8711985-10-25025 October 1985 Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 ML20078L1661983-10-17017 October 1983 Response Opposing Wisconsin Environ Decade 830923 Petition for Review of ALAB-739 Re Steam Generator Tubes Repaired by Sleeving.Nexus Between Sleeving & Tube Failure Shown. Certificate of Svc Encl ML20078C8801983-09-23023 September 1983 Petition for Review of Aslab 830907 Decision on Sleeving Degraded Steam Generator Tubes.Aslab Erroneously Denied Nexus Shown Between Sleeving & Tube Failure.Certificate of Svc Encl ML20076E1581983-08-22022 August 1983 Response Opposing Wisconsin Environ Decade 830811 Request to Respond to Hf Conrad Affidavit.Aslab Affirmed Dismissal of Decade Petition to Intervene.Decade Thus Lacks Party Standing.Certificate of Svc Encl.Related Correspondence ML20204G3481983-04-29029 April 1983 Brief Opposing Wisconsin Environ Decade Exceptions to ASLB 830204 Initial Decision Authorizing full-scale Sleeving. Exceptions Waived for Failure to Brief or Arguments W/O Merits ML20069K5951983-04-22022 April 1983 Answer Opposing Wisconsin Environ Decade 820407 Petition for Review of ALAB-719 Which Affirmed ASLB 821210 Special Prehearing Conference Order Dismissing Petition to Intervene.Matter Raised Not Reviewable.W/Certificate of Svc ML20073D6991983-04-11011 April 1983 Request for Extension Until 830427 to File Opposition to Wisconsin Environ Decade Brief on Exceptions.Counsel Has Numerous Obligations Before ASLB & Aslab.Certificate of Svc Encl ML20073B9701983-04-0707 April 1983 Petition for Review of Aslab 830322 Decision Denying Wisconsin Environ Decade 821220 Appeal of ASLB 821210 Prehearing Conference Order.Hearing on Steam Generator Tube Degradation Issue Should Be Held.Certificate of Svc Encl ML20069F6491983-03-16016 March 1983 Brief Supporting Wi Environ Decade 830211 Exceptions to ASLB Initial Decision.Aslb Refused to Make Prerequisite Findings on Degree of Assurance Necessary to Protect Public Safety. Affidavit of Mailing Encl ML20071A1311983-02-14014 February 1983 Exceptions to ASLB 830204 Initial Decision.Affidavit of Mailing Encl ML20064H4191983-01-10010 January 1983 Replacement P 2 of 821220 Proposed Findings of Fact & Conclusions of Law in Form of Proposed Initial Decision. Svc List Encl ML20070M0571983-01-0707 January 1983 Comments on Wi Environ Decade Statement of Inadequate Record.Statement Is Inconsistent W/Commission Regulations, Erroneous in Statement of Law,Untimely,Devoid of New Factual Info & Should Not Be Considered.Certificate of Svc Encl ML20028C3091983-01-0404 January 1983 Proposed Evidentiary Hearings Transcript Changes.Certificate of Svc Encl ML20028C3031983-01-0404 January 1983 Brief Opposing Wi Environ Decade 821220 Appeal of ASLB 821210 Special Prehearing Conference Order Denying Decade 820810 Petition to Intervene.Decade Willfully Failed to Attend Special Prehearing Conference.W/Certificate of Svc ML20070M0141982-12-30030 December 1982 Statement of Inadequate Record.Eddy Current Testing Not Proved Adequate for Sleeving Steam Generator Tubes.Record Must Be Reopened.Certificate of Svc Encl ML20070J0341982-12-20020 December 1982 Brief Supporting Appeal from 821210 Special Prehearing Conference Order Denying 820810 Petition to Intervene & Request for Extension of Time to Complete Brief.Dismissal of Petition on Stated Grounds Contrary to Law ML20070J0141982-12-20020 December 1982 Notice of Appeal from 821210 Special Prehearing Conference Order Dismissing Decade 820810 & 1105 Petitions to Intervene.Affidavit of Mailing Encl ML20070H4011982-12-20020 December 1982 Proposed Findings of Fact & Conclusions of Law in Form of Proposed Initial Decision Re Repair of Corroded Steam Generator Tubes by Inserting Sleeves.Certificate of Svc Encl ML20027E3171982-11-0505 November 1982 Contentions Re Steam Generator Replacement,Supplementing 820810 Petition to Intervene ML20027D4691982-11-0202 November 1982 Testimony of Wd Fletcher Re Adequacy of Eddy Current Testing.Certificate of Svc Encl.Related Correspondence ML20069J3451982-10-20020 October 1982 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP 1997-06-09 Category:PLEADINGS MONTHYEARML20078L1661983-10-17017 October 1983
[Table view]Response Opposing Wisconsin Environ Decade 830923 Petition for Review of ALAB-739 Re Steam Generator Tubes Repaired by Sleeving.Nexus Between Sleeving & Tube Failure Shown. Certificate of Svc Encl ML20078C8801983-09-23023 September 1983 Petition for Review of Aslab 830907 Decision on Sleeving Degraded Steam Generator Tubes.Aslab Erroneously Denied Nexus Shown Between Sleeving & Tube Failure.Certificate of Svc Encl ML20076E1581983-08-22022 August 1983 Response Opposing Wisconsin Environ Decade 830811 Request to Respond to Hf Conrad Affidavit.Aslab Affirmed Dismissal of Decade Petition to Intervene.Decade Thus Lacks Party Standing.Certificate of Svc Encl.Related Correspondence ML20069K5951983-04-22022 April 1983 Answer Opposing Wisconsin Environ Decade 820407 Petition for Review of ALAB-719 Which Affirmed ASLB 821210 Special Prehearing Conference Order Dismissing Petition to Intervene.Matter Raised Not Reviewable.W/Certificate of Svc ML20073D6991983-04-11011 April 1983 Request for Extension Until 830427 to File Opposition to Wisconsin Environ Decade Brief on Exceptions.Counsel Has Numerous Obligations Before ASLB & Aslab.Certificate of Svc Encl ML20073B9701983-04-0707 April 1983 Petition for Review of Aslab 830322 Decision Denying Wisconsin Environ Decade 821220 Appeal of ASLB 821210 Prehearing Conference Order.Hearing on Steam Generator Tube Degradation Issue Should Be Held.Certificate of Svc Encl ML20069F6491983-03-16016 March 1983 Brief Supporting Wi Environ Decade 830211 Exceptions to ASLB Initial Decision.Aslb Refused to Make Prerequisite Findings on Degree of Assurance Necessary to Protect Public Safety. Affidavit of Mailing Encl ML20071A1311983-02-14014 February 1983 Exceptions to ASLB 830204 Initial Decision.Affidavit of Mailing Encl ML20070J0341982-12-20020 December 1982 Brief Supporting Appeal from 821210 Special Prehearing Conference Order Denying 820810 Petition to Intervene & Request for Extension of Time to Complete Brief.Dismissal of Petition on Stated Grounds Contrary to Law ML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063J4521982-08-31031 August 1982 Reply Brief Supporting Wi Environ Decade 820721 Motion Concerning Litigable Issues & in Response to Licensee 820809 & 24 & NRC 820812 Responses.Contentions Timely & Relevant. Certificate of Svc Encl ML20063D1301982-08-24024 August 1982 Response to Wi Environ Decade 820721 Amend to Motion Re Litigable Issues.Proposed Contention 3(f) Fails to Satisfy Requirements for Establishing Litigable Issues.Motion Should Be Rejected.Certificate of Svc Encl ML20063D0131982-08-20020 August 1982 Amend to Motion Re Third Litigable Issue on Increased Probability of Tube Failures Due to Sleeving,Per ASLB Direction During 820601 Conference.Change Adds Contention F on Sleeves in Corroded Tubes.W/Certificate of Svc ML20063C6411982-08-0909 August 1982 Response to Wi Environ Decade 820720-21 Motion Concerning Litigable Issues.Decade Estopped from Raising Number of Proposed Contentions.Decade Fails to Justify Untimeliness. Some Proposed Issues Irrelevant ML20058C0221982-07-22022 July 1982 Motion for Leave to Conduct Discovery of Wi Environ Decade Re Decade Contacts W/Sleeving Demonstration Program Workers. Discovery Requests Based on New Info.Interrogatories & Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054L6391982-06-30030 June 1982 Request for Clarification of Paragraph 7 of ASLB 820526 Memo & Order.Paragraph Can Be Interpreted as Suspending FOIA Applicability to Enumerated Westinghouse Proprietary Info. W/Certificate of Svc.Related Correspondence ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052F3221982-05-0707 May 1982 Addendum to Wi Environ Decade 820503 Motion for Reconsideration of Part II of ASLB 820422 Memorandum & Order Re Motion to compel.NUREG-0909 Re Ginna 820125 Tube Rupture Adds & Strengthens Motion.Certificate of Svc Encl ML20052D8301982-05-0303 May 1982 Motion for Reconsideration of ASLB 820422 Memorandum & Order Part II Denying Decade Motion to Compel Response to Embrittlement Interrogatories.Certificate of Svc Encl ML20052F3701982-05-0202 May 1982 Reply Brief on Confidentiality Issue in Response to Westinghouse,Wi Electric Power Co & NRC Briefs & Opposing Trade Secret Protection for Sleeving Safety Tests. Certificate of Svc Encl ML20052C7341982-04-30030 April 1982 Reply Brief Opposing Wi Environ Decade Oral Motion for Public Disclosure of Certain Proprietary Info.Motion Is Impermissible Challenge to Commission Regulations. Certificate of Svc Encl ML20054E0501982-04-21021 April 1982 Brief Opposing Wi Environ Decade Oral Motion for Public Disclosure of Proprietary Info.No Special Circumstances Exist to Overrule.Commission Compelling Public Policy Reason for Withholding Proprietary Info.Certificate of Svc Encl ML20052A3601982-04-21021 April 1982 Brief of Westinghouse,Appearing Specially,Re 10CFR2.790 Balancing Test.Aslb Should Affirm NRC Determination & Continue to Accord Westinghouse Proprietary Info Protection Against Public Disclosure.Certificate of Svc Encl ML20052A3821982-04-20020 April 1982 Brief Re Confidentiality Issue.Opposes Trade Secret Protection for Safety Tests, & Receipt of Evidence Into Record of Info Withheld from Opposing Parties.Certificate of Svc Encl ML20054D9811982-04-16016 April 1982 Reply to Licensee 820412 Response to Wi Environ Decade 820328 Motion to Compel Licensee Answer to First Set of Interrogatories.Aslb Jurisdiction Should Be Expanded. W/Certificate of Svc.Related Correspondence ML20050V1421982-04-12012 April 1982 Response Opposing Wi Environ Decade 820328 Motion to Compel Answers to First Set of Interrogatories Re full-scale Sleeving.Interrogatories Irrelevant ML20050V0221982-04-12012 April 1982 Response Opposing Wi Environ Decade 820328 Request to Undertake Discovery of NRC on Recent Events at Ginna & TMI Re Steam Generator Tube Degradation.Proposed Discovery Beyond Scope of Hearing.Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20050A8321982-03-28028 March 1982 Motion to Compel Answer to First Set of Interrogatories Directed to Licensee Re full-scale Sleeving.Related Correspondence ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049K0501982-03-24024 March 1982 Answer Supporting Westinghouse 820309 Motion for Reconsideration of ASLB 820226 Memorandum & Order. Decision on Withholding Proprietary Info Substantive & Sua Sponte Rule Applicable.W/Certificate of Svc ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20041F7691982-03-11011 March 1982 Response to Wi Environ Decade 820227 Objection to Admission of Testimony on Confidentiality Issue.Decade Objection to Deletion of Info Re Amount of Money Expended to Develop Sleeving Program Unwarranted.Certificate of Svc Encl ML20041F0831982-03-10010 March 1982 Answer Opposing Wi Environ Decade 820224 Motion to Reconsider ASLB 820219 Memorandum & Order,Part Iv.No Objection to Alternative Motion That Order Be Clarified. Certificate of Svc Encl ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20041G1661982-03-0909 March 1982 Motion for Consideration of Portion of ASLB 820226 Memorandum & Order in Which ASLB Refused to Forward Determination Re Sua Sponte to Question to Ofc of General Counsel & Commission.Certificate of Svc Encl ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041E2661982-02-27027 February 1982 Objection to Admisssibility of RA Wiesmann & Tg Colburn Testing on Confidentiality Issue.Intervenor Copy of Wiesmann Testimony Does Not Include Alleged Investment Cost Re Sleeving.W/Certificate of Svc.Related Correspondence ML20041C6741982-02-24024 February 1982 Motion for Reconsideration of Part IV of ASLB 820219 Memorandum & Order.Prior Policy That Contentions Need to Be Completely Enumerated Until Filing of Motion Concerning Litigable Issues Should Be Reinstated.W/Certificate of Svc ML20041C3311982-02-23023 February 1982 Motion to Certify ASLB Determination in 820202 Order.Page 9, Re Sua Sponte Question,To Commission.Alternatively Requests ASLB Forward Order to Ofc of General Counsel & Commission for Commission Determination.Certificate of Svc Encl 1983-09-23 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19250B902&oldid=1893580"