ML19250B609

From kanterella
Jump to navigation Jump to search
Acks Receipt of 791003 Interim Rept Re Natural Gas Pipeline Break Analysis
ML19250B609
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/18/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 7911010188
Download: ML19250B609 (1)


Text

M

/

'o UNITED STATES

~,,

g NUCLEAR REGULATORY COMMISSION g

u a REGION lil o

799 ROOSEVELT ROAD o

GLEN ELLYN. ILLINOIS 6o137 OCT 101979 Docket No. 50-440 s

Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering P. O. Box 5000 Cleveland, OH 44101 Gentlemen:

Thank you for your interim report dated October 3, 1979, pursuant to 10 CFR 50.55(e) regarding natural gas pipeline break analysis. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, s

torelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Ohio Power Siting Commission Mr. Daniel D. Wilt, Attorney

\\ 2.7 3 ') b 9

9 791101 0 IFF