Forwards IE Insp Repts 50-518/79-18,50-519/79-18, 50-520/79-18 & 50-521/79-18 on 790820-22.No Noncompliance Noted
ML19250A601
Person / Time
Site: Hartsville, Palo Verde  Tennessee Valley Authority icon.png
Issue date: 09/11/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19250A602 List:
References
NUDOCS 7910240042
Download: ML19250A601 (2)


See also: IR 05000518/1979018

Text

Dc

-

oq*o

~;k .:i/./

pn *Ec

,

UNITED STATES

?

,

NUCLEAR REGULATORY COMMISSION

.;

3

E

REGION 11

'#

f , '.

O,

101 MARIETTA ST., N.W., SUITE 3100

- -

%

ATLANTA. G EORGIA 3o3o3

In Reply Refer To:

SEP 11 M

RII:WHM

50-518/79-18

50-519/79-18

50-520/79-18

50-521/79-18

Tennessee Valley authority

Atta:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlcmen:

.

This refers to the inspection conducted by W. H. Miller, Jr. of this

office on August 20-22, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville

Nuclear Plant facility, and to the discussion of our findings held with

R. T. Hathcote at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedur; , and representative

records, interviews with personnel, and observations by the inspector.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report. These items will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Roam.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

.

1202 200

1

7910240

.

SEP 111979

Tennessee Vr11ey Authority

-2-

'

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

<

i

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-518/79-18,

50-519/79-18, 50-520/79-18 and

50-521/79-18

cc w/ enclosures:

R. T. Hathcote, Project Manager

Post Office Box 2000

Hartsville, Tennessee 37074

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, Tennessee 37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

1202 201