T Q\\
-
.
km Mf C
5
/
%
UNITED STATES
.
!.\\ > Nd [' S
NUCLEAR REGULATORY COMMISSION
I
5A :l 'A . c
REGION 111
b
0, h' V
[
799 ROOSEVELT ROAD
e
GLEN ELLYN,ILLINolS 60137
3eT9"
.....
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
Assistant Vice President
Energy Supply
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of this office
on August 30-31, 1979, at Davis-Besse Nuclear Power Station, Unit 1,
authorized by NRC License No. NPF-3 and to the discussion of our findings
with Mr. B. R. Beyer, and others at the conclusion of the inspection.
The enclosed copy of our inspeccion report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure to
the application.
.
1202 IO
7910240O b
6
.
.
Toledo Edison Company
-2-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
,s
M
b
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-346/79-24
cc w/ encl:
Mr. T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Ohio Power
Siting Commission
Helen W. Evans, Director,
Division of Power Generation
.