ML19250A579

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/79-24 on 790830-31.No Noncompliance Noted
ML19250A579
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/11/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19250A580 List:
References
NUDOCS 7910240005
Download: ML19250A579 (2)


See also: IR 05000346/1979024

Text

T Q\\

-

.

km Mf C

5

/

%

UNITED STATES

.

!.\\ > Nd [' S

NUCLEAR REGULATORY COMMISSION

I

5A :l 'A . c

REGION 111

b

0, h' V

[

799 ROOSEVELT ROAD

e

GLEN ELLYN,ILLINolS 60137

3eT9"

.....

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Assistant Vice President

Energy Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this office

on August 30-31, 1979, at Davis-Besse Nuclear Power Station, Unit 1,

authorized by NRC License No. NPF-3 and to the discussion of our findings

with Mr. B. R. Beyer, and others at the conclusion of the inspection.

The enclosed copy of our inspeccion report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure to

the application.

.

1202 IO

7910240O b

6

.

.

Toledo Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,s

M

b

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-346/79-24

cc w/ encl:

Mr. T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio Power

Siting Commission

Helen W. Evans, Director,

Division of Power Generation

.