Text
.&
.
pm Raou
UNITED STATES
.
+
., g
NUCLEAR REGULATORY COMMISSION
.
o
R EGION lli
Es
'f
799 ROOSEVELT ROAD
%,
/
GLEN ELLYN, ILUNO4 60137
.....
OCT 111979
-:
.
d Docket No. 50-358
ncinnati Gas and Electric
Conpany
ATTN:
Mr. Earl A. Borgmann
Senior Vice President
Engineering Services and
Electric Prodt.ction
139 East 4th Street
Cincinnati, OH 45201
Gentlemen:
Please find enclosed Exhibits I and II to IE Investigation Report
No. 50-358/79-26. These exhibits were inadvertently separated from
the report.
Sincerely,
James G. Kepp er
Director
Enclosures: As Stated
cc w/encls:
Mr. J. R. Schott, Plant
Superintendent
G. Gower, Acting XOOS
Central Files
Reproduction Unit NRC 20b
Local PDR
paroldW.Kohn,OhioPower
- Siting Commission
g
2:itizens Against a
Radioactive Environment
-
Helen W. Evans, State
_*
of Ohio
)
L.
- 1 0 092
DR O
7910230 :(
4
INTER OFFICE MEMORANDUM
'
To
B. K. Culver +.
DATE August 16, 1979
AT
Moscow
- -- --
rnoM J. A. Carter
. COPIES TO R. Marshall
.
,
o
R. Turner
V
AT
MOSCOW
Joa no.
7070 -
_
_
SUBJECI TERMINATION OF SERVICES OFTmi4,,4 a,,a ;.gn
N
On June 11, 1979, the services of
Ind."A"
were contracted by the Henry
J. Kaiser Company at the Wm. H. Zimmer Nuclear Power Station throug: athr
Services Group, Inc. The services of such employees are considered temporary
in nature, and they are considered to be probationary employees for a period
of two to three months. After a period of testing and training,
Ind."A"
was qualified as an inspector and issued an inspection stamp.
Over the past several weeks,
Ind."A"'s
supervisors, who were monitoring his
work, determined that
Ind."A"
was performing inadequate inspections and
that his performance was not in accordance with the standards required by
the Nuclear Regulatory Commission.
,
As a result of this determination, it was decided that the services of
Ind . A"
were no longer required, and the contract with Butler Services,
Inc. for his services was cancelled on August 14, 1979.
Henry J. Kaiser
Company did not employ
Ind."A"
so, therefore, the Company could not term-
inate him. Wnether or not
Ind."A" is stili employed by Butler Services,
Inc. is beyond our knowledge and/or control.
At the present time, our
Quality Assurance Department is in the process of reverifying the inspections
performed by
Ind. "A" during the short period of time he worked at the
Zimmer site.
JAC/gk
.
Exhibit 1
-;
b?
!
--
.
s
.
?
kcl 189
w
w.
-.
_. m . - - ,_ _
_ _ _ + - _ _ -
- m e -.-
_ _ _
,_,_y,.---
_ ww
--
,
--
-
.
HENR Y J. KA/SER COMPA N Y
.
P O B0: 201
MOSCOW OHt0 45153
August 14, 1979
.
-i
E
TO:
le
gg }
FROM:
S. acath, inspection Supervisor
1
[
SUBJECT: TERMINATION OF CONTRACT EMPLOYEE
Bea Palermo, Personnel Manager at Butler Services, was contacted approximately
8:00 AM this date, concerning Individual"A"s performance in the area of visual
inspection.
Indiv."A"
was contracted by Kaiser from Butler Services Group,
Inc. on June 11, 1979.* He completed his reading list, passed his Visual Weld
Ir.spection Test and Liquid Penetrant Test on June 15, 1979
He was issued an
irs;ection Stamp on that date.
inspections as itemi2ed below reveal that he did not perform in
Iradequate
accordance with his qualifications as reflected by his resume and certifi-
cations.
1) Welder qualification was expired and the inspector should have
identified this condition at the time tacks and fitup inspection
was made, instead he allowed the unqualified welder to complete the
weld.
Nonconformance report E1985 was issued.
.
2)
Inspector allowed welders qualified for weld procedure 3.1.51 weld
to 3.1.21 without approval from the Welding Engineer, and without
3.1.21 being cross referenced in QACHI G-12, as an equal to 3.1.51.
3)
Several fitups in the suppression pool modification contrary to
the designs specification were accepted by the inspector.
a)
Backing strips on plates 2C, IC and 6C were to short and
left gaps of the sizes 1" x 1/8", 1" x 1/4", and i 1/4" x
1/4" respectively. The gaps will not allow full penetration
selds as designed or allowed by DDC S-1701.
4
I
jg
b)
acking strips on plate 3C were supposed to be fit y d under
s
the liner plate near the penetration per DDC S-170L
The
--
1/2" liner plate was not ground down to allow the proper
fitup, instead the backing strip was tacked to the, edge of
the liner plate allowing space between backing strip and
liner thus preventing full penetration weld.
?~0 094
,
Exhibit II
Page 1 of 2
A R AYMONo INTERN ATioN AL COMPANY
,
.
Page 2 of 2
,
HENR Y J. KAISER COMPA N Y
,
P O BOX 20:
MOsCOA. CHIO 45153
'
-2.
c)
Paint and heavy rust was left on backing strip.
d)
Tacks on backing strips were cracked.
He also was not receptive to instructions and clarifications provided by
supervision.
It was expressed to Bea Palermo that Kaiser would like to
terminate it's contract as soon as post.ible.
Approximately 1:00 PM, Bea Palermo called to inform Kaiser QA that
contract was terminated this date.
.
~ P.:.Y J . KA I S ER CO .
-
4
Silas E. Heath
inspection Supervisor
SEH/dd
cc:
Bea Palermo
Jack Carter
Robert Turner
?
I
$-
t
+
_
.
&
Exhibit II
page 2 of 2
l
.
OIJ95
-
A R AYMoNn INT ERN ATioNAL COMPANY