ML19250A320
| ML19250A320 | |
| Person / Time | |
|---|---|
| Site: | Yellow Creek |
| Issue date: | 09/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19250A321 | List: |
| References | |
| NUDOCS 7910230048 | |
| Download: ML19250A320 (2) | |
See also: IR 05000566/1979012
Text
l0
.
[6 -fd d
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
g .7
o
g
r
REGION 11
.:
e'['
101 MARIETTA ST., N.W.. SUITE 3100
o,
%
ATLANTA, GEORGIA 3o3o3
In Reply Refer To:
SEP 0 51979
RII:JJL
50-566/79-12
50-567/79-12
Tennessee Valley Authority
Atta:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this ottice
on August 8-10, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-172 and CPPR-173 for the Yellow Creek Nuclear Plant facility,
Unit Nos. I and 2, and to the discussion of our findings held with
C. Wages at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these treas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclose <1 inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Publi Document Room.
'1"9
284
7910230 C N
.
SEP 0 51979
Tennessee Valley Authority
-2-
,
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
.
C. E. Murphy, hie
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-566/79-12
and 50-567/79-12
cc w/ enclosures:
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee 37902
M. M. Price, Project Manager
Post Office Box 2000
Iuka, Mississippi 38852
D. L. Terrill, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
.!
9
285
'
.
O