Text
IM
.
.
Sn ato
UNITED STATES
/
- o
NUCLEAR REGULATORY COMM!sslON
[
}M'q(
g
REGION I
,a
,.g
63? PARK AVEf4UE
C
KING OF PHUS$1 A, PENNSYLVANIA 19406
sp /
M
6 1979
Dock
No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN: Mr. Robert H. Groce
Licensing Engineer
20 Turnpike Road
Westborough, Massachusetts 01581
Gentlemen:
Subject:
Inspection 50-271/79-08
This refers to the inspection conducted by Mr. T. Stetka of this office on
May 15-17 and 21-25,1979, at Vennont Yankee Nuclear Power Station, Vernon,
Vermont, of activities authori::ed by NRC License No. DPR-28 and to the
discussions of our findings held by Mr. Stetka with Mr. W. Conway and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspec-
tion and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the. inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains uny information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written applica-
tion within 20 days to this office to withhold such information from public
disclosure. Any such application must be accompanied by an affidavit
executed by the owner of the information, which identifies the document or
part sought to be withheld, and which contains a statement of reasons which
addresses with specificity the items which will be considered by the Commission
as listed in subparagraph (b)(4) of Section 2.790.
The information sought
to be withheld shall be incorporated as far as possible into a separcte
part of the affidavit.
If we do not hear from vou in this regard within
the specified period, the report will be placed in the Public Document
Room.
1074
193
2910080 @h @
.
.
Vermont Yankee Nuclear Power Corporation
AUG
6 1973
2
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
,ith you.
Sir:erely,
,
'
t>
ldo
nner, Chief
.
Reactor Operations and Nuclear
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection heport
Number 50-271/79-08
cc w/ encl:
W. F. Conway, Plant Superintendent
Ms. J. Abbey, Technical Secretary
A. Z. Roisman, Natural Resources Defense Council (Without Report)
%
1074
I94