g

b

["p# PICg

'

o

o

UNITED STATES

E'

, ,., j' %

NUCLEAR REGULATORY COMMISSION

5'

#-

E

REGION ill

  • k h[j !

o

799 RGOSEVELT ROAD

E

GLEN E LLYN, ILLINolS 60137

% . .%r

[dC ,o, , ms

...

Decket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. C. M. Erb and

H. H. Liv rmore of this office on August 7-9, 1979, of activities at the

Braidwood Station, L' nits 1 and 2, authorized by NRC Construction Permits

No. CPPR-132 and No. CPPR-133 and to the discuss 4cn of our findings with

Mr. R. Cosaro and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contactors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this let'er, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure to

the application.

1079

094

Snooso W

g

.

.

.

Commonwealth Edison Com;any

-2-

. gg

LL e a

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

M

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branen

Enclosure:

IE Inspection

Reports No. 50-456/79-09

and No. 50-457/79-09

cc w/ encl:

Mr. R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

1079 095