05000277/LER-1979-042-01, /01T-0:on 790906,seismic & Redundancy Design Deficiencies Re Electrical Feeds Were Found on Containment Atmosphere Dilution Sys Valves & Instrumentation.Caused by Inadequate Design by A/E.Control Cables Installed

From kanterella
(Redirected from ML19249E449)
Jump to navigation Jump to search
/01T-0:on 790906,seismic & Redundancy Design Deficiencies Re Electrical Feeds Were Found on Containment Atmosphere Dilution Sys Valves & Instrumentation.Caused by Inadequate Design by A/E.Control Cables Installed
ML19249E449
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/20/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19249E448 List:
References
LER-79-042-01T, LER-79-42-1T, NUDOCS 7910010435
Download: ML19249E449 (1)


LER-1979-042, /01T-0:on 790906,seismic & Redundancy Design Deficiencies Re Electrical Feeds Were Found on Containment Atmosphere Dilution Sys Valves & Instrumentation.Caused by Inadequate Design by A/E.Control Cables Installed
Event date:
Report date:
2771979042R01 - NRC Website

text