ML19249E409
| ML19249E409 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 08/09/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Martin T Public Service Enterprise Group |
| Shared Package | |
| ML19249E410 | List: |
| References | |
| NUDOCS 7910010325 | |
| Download: ML19249E409 (2) | |
See also: IR 05000354/1979005
Text
1
A
p ng
UNITED STATES
o
NUCLEAR REGULATORY COMMisslON
o
REGION l
$
,l
631 PARM AVENUE
C
KING OF PRUSSIA, PENN5YLVANIA 19406
%+..../
AUG 0 9 im
Docket Nos. 50-354
50-355
Public Service Electric & Gas Company
ATTN: Mr. T. J. Martin
Vice President
Engi1eering and Construction
80 Park Place
Newark, New Jersey 07101
Gentlemen:
Subject:
Combined Inpsection 50-354/79-05; 50-355/79-05
This refers to the inspection conducted by Mr. L. Narrow of this office on June
18-21, 1979, at Hope Creek Generating Station, Unit 1 and 2 site in Hancocks
Bridge, New Jersey, of activities authorized by NRC License Nos. CPPR-120 and
CPPR-121 and to the discussions of our findings held by Mr. Narrow with Mr.
Giardino and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncomplunce were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report con-
tains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 drys to this
office to withhold such information from public disclosure.
Any such appli-
cation must be accompanied by an affidavit executed by the owner of the in-
formation, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4) of
Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
7910 010 3 2-$ 6
1065
170
'
.
.
Public Service Electric & Gas
2
Company
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
1l$
'"
-
obert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-354/79-05 and 50-355/79-05
cc w/ encl:
E. N. Schwalje, Manager - Quality Assurance,
Engineering and Construction Department
1G65
171