ML19249D460
| ML19249D460 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/02/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19249D461 | List: |
| References | |
| NUDOCS 7909240693 | |
| Download: ML19249D460 (2) | |
See also: IR 05000327/1979036
Text
pte nec%'o
UNITED STATES
e
4
g .l
~')
NUCLEAR REGULATORY COMMISSION
c[X9 9 Y
',
!\\
,
,,.
REGION 11
jpg
o,
-;
101 MARIETTA sT., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
% . .N , -
...
AUG o 21979
In Reply Refer To:
RII:MJG
50-327/79-36
50-328/79-21
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by M. J. Gouge of this office on July 10-
13, 1979, of activities authorized by NRC Construction Permit Nos. CPPR-72 and
CPPR-73 for the Sequoyah facility, Units 1 and 2, and to the discussion of our
findings held with G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection unsisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
7900240693
0
<
.
AUG 0 21979
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
, c.
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-327/79-36
50-328/79-21
cc w/ enc 1:
J. E. Gi11 eland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401