Forwards IE Insp Repts 50-321/79-20 & 50-366/79-25 on 790709-13.No Noncompliance Noted
ML19249C925
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/08/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19249C924 List:
References
NUDOCS 7909190294
Download: ML19249C925 (2)


See also: IR 05000321/1979020

Text

-

.

7

'o,

UNITED STATES

8'

) .r, g' j

NUCLEAR REGULATORY COMMISSION

'

a

, '

' '"V

E

REGION 11

8

101 MARIETT A sT., N.W., sulTE 3100

0,,

% .'.\\

[

AT LANT A, GEORGI A 30303

..+

In Reply Refer To:

RII:DJP

AUG 0 81979

50-321/79-20

50-366/79-25

Georgia Power Company

Atta:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this office

on July 9-13, 1979 of activities authorized by NRC License Nos. DPR-57

and NPF-5 for the Hatch facility, Units 1 and ?, and to the discussion

of our findings held with M. Hanry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed ir.spection repcrt. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items. The status of these

items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

- { {,

lUk

7 9 0919 ogg

'

AUG 0 81979

-

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

E

t

-

J. T. Sutherland, Chief

Fuel Facility and

Materials Safety Branch

Enclosures:

Inspection Report Nos. 50-321/79-20

and 50-366/79-25

cc w/ enclosures:

F.. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

Post Office Box 442

Baxley, Georgia 31513

'](3 5

\\b