ML19249C925
| ML19249C925 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/08/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19249C924 | List: |
| References | |
| NUDOCS 7909190294 | |
| Download: ML19249C925 (2) | |
See also: IR 05000321/1979020
Text
-
.
7
'o,
UNITED STATES
8'
) .r, g' j
NUCLEAR REGULATORY COMMISSION
'
a
- , '
' '"V
E
REGION 11
8
101 MARIETT A sT., N.W., sulTE 3100
0,,
% .'.\\
[
AT LANT A, GEORGI A 30303
..+
In Reply Refer To:
RII:DJP
AUG 0 81979
50-321/79-20
50-366/79-25
Georgia Power Company
Atta:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by D. J. Perrotti of this office
on July 9-13, 1979 of activities authorized by NRC License Nos. DPR-57
and NPF-5 for the Hatch facility, Units 1 and ?, and to the discussion
of our findings held with M. Hanry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed ir.spection repcrt. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items. The status of these
items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
- { {,
lUk
7 9 0919 ogg
'
AUG 0 81979
-
Georgia Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
E
t
-
J. T. Sutherland, Chief
Fuel Facility and
Materials Safety Branch
Enclosures:
Inspection Report Nos. 50-321/79-20
and 50-366/79-25
cc w/ enclosures:
F.. Manry, Plant Manager
Post Office Box 442
Baxley, Georgia 31513
C. E. Belflower
Site QA Supervisor
Post Office Box 442
Baxley, Georgia 31513
'](3 5
\\b