ML19249C790

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/79-24 & 50-366/79-28 on 790602-0703.No Noncompliance Noted
ML19249C790
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/06/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19249C789 List:
References
NUDOCS 7909180518
Download: ML19249C790 (2)


See also: IR 05000321/1979024

Text

.

,

/

%o

UNITED STATES

-

l'3,

  1. 'n

NUCLEAR REGULATORY COMMISSION

i

3

E

REGION ll

101 MARIETT A sT., N.W., sUtTE 3185 .

8

o,

E

ATLANTA, GEORGI A 30303

,

%,-

AUG 6

1979

d

[

In Reply Refer To:

RII:RFRIII

50-321/79-24

50-366/79-28

Georgia Power Company

Atta:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by R. F. Rogers of this office on June 2

through July 3, 1979 of activities authorized by NRC License Nos. DPR-57 and

NPF-5 for the Hatch facilities, Units 1 and 2, and to the discussion of our

findings held with M. Manry periodically during the inspection interval.

Areas examined during the inspection and our findings are discussed in the

Within these areas, the inspection consisted of

enclosed inspection report.

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no new items of noncompliance were identified.

Another example was identified of apparent noncompliance, Item A.I. brought to

your attention in our letter dated July 20, 1979.

Technical Specification 6.9.1.B., specifies that for events requiring reporting within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by

telephone, a written confirmation shall be transmitted by the first working day

Your written confirmations involving failure of the High

following the event.

Pressure Coolant Injection and Reactor Core Isolation Cooling System failures on

June 3,1979, were not received in this office until June 5,1979. Consequently,

in your reply to the item referenced above, please give particular attention to

your corrective action to prevent recurrence.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

from public disclosure. Any such application must

withhold such information

include a full statement of the reasons on the basis of which it is claimed that

information is proprietary, and should be prepared so that proprietary

the

information identified in the application is contained in a separate part of the

If we do not hear from you in this regard within the specified period,

document.

the report will be placed in the Public Document Room.

.

7 909180 f//r'

M3

S 6cJ

'

l

-2-

Georgia Power Company

AUG 6

1979

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

/E. C.

R. C. L wis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-321/79-24

and 50-321/79-28

cc w/ enclosures:

M. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

Post Office Pax 442

Baxley, Georgia 31513

.

.

Y

)

.