Text
.
,
/
%o
UNITED STATES
-
l'3,
- 'n
NUCLEAR REGULATORY COMMISSION
i
3
E
REGION ll
101 MARIETT A sT., N.W., sUtTE 3185 .
8
o,
E
ATLANTA, GEORGI A 30303
,
%,-
AUG 6
1979
d
[
In Reply Refer To:
RII:RFRIII
50-321/79-24
50-366/79-28
Georgia Power Company
Atta:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on June 2
through July 3, 1979 of activities authorized by NRC License Nos. DPR-57 and
NPF-5 for the Hatch facilities, Units 1 and 2, and to the discussion of our
findings held with M. Manry periodically during the inspection interval.
Areas examined during the inspection and our findings are discussed in the
Within these areas, the inspection consisted of
enclosed inspection report.
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no new items of noncompliance were identified.
Another example was identified of apparent noncompliance, Item A.I. brought to
your attention in our letter dated July 20, 1979.
Technical Specification 6.9.1.B., specifies that for events requiring reporting within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by
telephone, a written confirmation shall be transmitted by the first working day
Your written confirmations involving failure of the High
following the event.
Pressure Coolant Injection and Reactor Core Isolation Cooling System failures on
June 3,1979, were not received in this office until June 5,1979. Consequently,
in your reply to the item referenced above, please give particular attention to
your corrective action to prevent recurrence.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
from public disclosure. Any such application must
withhold such information
include a full statement of the reasons on the basis of which it is claimed that
information is proprietary, and should be prepared so that proprietary
the
information identified in the application is contained in a separate part of the
If we do not hear from you in this regard within the specified period,
document.
the report will be placed in the Public Document Room.
.
7 909180 f//r'
M3
S 6cJ
'
l
-2-
Georgia Power Company
AUG 6
1979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
/E. C.
R. C. L wis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
Inspection Report Nos. 50-321/79-24
and 50-321/79-28
cc w/ enclosures:
M. Manry, Plant Manager
Post Office Box 442
Baxley, Georgia 31513
C. E. Belflower
Site QA Supervisor
Post Office Pax 442
Baxley, Georgia 31513
.
.
Y
)
.