ML19249C761

From kanterella
Jump to navigation Jump to search
Forwards LER 79-014/99X-0
Date released: 09/20/2019 Download: ML19249C761


LER 79-014/99X-0:on 790813,w/75% Reactor Power,Switchyard Relay 21Z1 Failed,Causing Turbine Trip.Caused by Lug Failure on Terminal Leads to Turbine Lockout Relay 286-T.Failed Lug Replaced,Terminals Tightened & Turbine Interlocks Tested
ML19249C764
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/12/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19249C764 (1)
Forwards LER 79-014/99X-0
ML19249C760
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/12/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19249C760 (1)