ML19249C568

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/79-14 & 50-306/79-11 on 790601-30.No Noncompliance Noted
ML19249C568
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/16/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML19249C569 List:
References
NUDOCS 7909130383
Download: ML19249C568 (2)


See also: IR 05000282/1979014

Text

  1. ep * "*%,'o

UNITED STATES

,

[4'

E

NUCLEAR CEGULATORY COMMISSION

TC

g

. , .

g -

v"'

t

REGION ill

o, - '

..

/'[

799 ROOSEVELT ROAD

I

[

GLEN ELLYN, ILLINOIS 60137

'

<

  • ...*

' JUL 161979

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

ATTN:

Mr. Leo Wachter

~I-

Vice President

Tower Production and

System Operation

414 Nicollet Mall

Minneapolis, Minnesota 55401

Gentlemen:

This refers to the inspection conducted by Mr. C. D. Feierabend of this

office on June 1-30, 1979 of activities at Prairie Island Nuclear Generating

Plant, Units 1 and 2 authorized by NRC Operating Licenses No. DPR-42 and

No. DPR-60 and to the discussion of our findings with Mr. Tierney and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows. If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

32S346

7009130.3 8/3

-

.

.

JUL 161979

Northern States Power Company

-2-

We will gladly discuss any questions you have concerning this inspection.

.;

Sincerely,

Sfh64%4Y br

R. F. Heishman, Chief

Reactor Operations and

Fuclear Support Branch

Enclosure:

IE Inspection

Report No. 50-282/79-14

and No. 50-306/79-11

cc w/ encl:

Mr. F. P. Tierney, Jr.

Plant Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

John W. Ferman, Ph.D.,

Nuclear Engineer

k

328349

570