Forwards IE Bulletin 79-02,Revision 1,Suppl 1, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. No Action Required
ML19249C148
Person / Time
Site: Millstone  
Issue date: 08/20/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 7909070494
Download: ML19249C148 (1)


Text

/

'c, UNITED STATES

[ '[j c% ( i NUCLEAR P.EGULATORY COMMISSION

/. E REGION I r,, J -

0, 1

631 PARK AVENUE s

%, ' N /

,o KING oF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-245 50-336 E 20 W Northeast Nuclear Energy Company ATTN:

Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Enclosed s IE Bulletin No. 79-02, Revision 1, Supplement No. 1, which clarifies NRC positions on actions requested with regard to your power reactor facility (ies) with an operating license.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely,

<'8 Boyce H. Grier Director

Enclosures:

1.

IE Bulletin No. 79-02, Revision No. 1 (supplement No. 1) 2.

List of IE Bulletins Issued in Last Six Months cc w/encls:

J. F. Opeka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguard: Engineer K. W. Gray, Construction Quality Assurance Lead H. R. Nims, Director of Nuclear Projects A. Z. Roisman, Natural Resources Defense Council

[)212"79 ID G307 oy77

ENCLOSURE 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.

20555 IE Bulletin No. 79-02 Revision No. 1 (Supplement No. 1)

Date:

August 20, 1979 Page 1 of 2 PIPE SUPPORT BASE PLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS Description of Circumstances:

The supplement to IE Bulletin No. 79-02 is intended to establish criteria for the evaluation of interim acceptability of plant operation with less than the design factors of safety for piping supports due to as-built problems, under design, base plate flexibility, or anchor bolt deficiencies.

In the reviews for system operability of the Duane Arnold and Crystal River facilit#as, criteria have been developed by the NRC staff that define pipe support operability.

The criteria have been applied in lieu of other analysis or evaluation.

Specifically, the licersees identified problems with pipe supports in which the original design factors of safety were not met but some lesser margin was available.

The der.ign margins of four or five are intended to be final design and in:;tallation objectives but systems may be classed as operable on an interim basis with some lesser margin providing a program of restoration to at least the Bulletin factors of safety has been developed.

Facilities which fall outside the operability criteria are considered to probably require a Technical Specification exception and will require review on a case by case t; asis.

Action to be Taken by Licensees:

For the following two cases, plant operation may continue or may oegin:

a.

For the support as a unit, the factor of safety compared to ultimate strengths is less than the original design but equal to or greater than two.

b.

For the anchor bolts the factor of safety is equal to or greater than two and for the support steel the original design factor of safety compared to ultimate strengths is met.

Theabovecriteriamaybeappliedprovid5*

^ ' ' # #" "~' ~ = ^ ~ ^

graded to design margins of safety expedf DUPLICATE DOCUMENT supports and by the next refueling for n R'1 M'O is as defined in Bulletin No. 79-14 wher Entire document previously entered those areas of the plant which can be er I into system under: