ML19249C113

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/79-15 & 50-306/79-12 on 790626-28.No Noncompliance Noted
ML19249C113
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/17/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML19249C114 List:
References
NUDOCS 7909070445
Download: ML19249C113 (2)


See also: IR 05000282/1979015

Text

[pR MGo

'o

UNITED STATES

8'

. g( n

NUCLEAR REGULATORY COMMISSION

$ .' , ",'d/ -

E

REGION 111

Tic

6

o,

h

799 ROOSEVELT ROAD

'%'

GLEN ELLYN, ILLINOIS 60137

o

  • ...+

JUL 171979

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

-

ATTN:

Mr. Leo Wachter

Vice President

Power Production and

System Operation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

This refers to the inspection conducted by Mr. E. J. Gallagher of this

office on June 26-28, 1979, of activities at Prairie Island Nucl-ar

Generating Plant, Units 1 and 2, authorized by NRC Operating License No.

DPR-42 and No. DPR-60 and to the discussion of our findings with Mr. P.

Tierney of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure.

The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

321230

7 0 0 007 0$49':5'~

.

JUL 171979

Northern States Power Company

- 2-

.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

.

'

1 ), ,s1g //f

-

.

/

-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-282/79-15

and No. 50-306/79-12

cc w/ enc 1:

Mr. F. P. Tierney, Jr.,

Plant Manager

John W. Ferman, Ph.D

Nuclear Engineer, MPCA

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

321231