ML19249B904
| ML19249B904 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/15/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 7909070065 | |
| Download: ML19249B904 (1) | |
Text
CENTRAL FILES o
UNITED STATES PDR:llQ
[ga arc,#'
NUCLEAR REGULATORY COMMISSION R
3V
'n REGION IV h
7, (Mj,'{,
o 611 RY AN PLAZA DHIVE, SulTE 1000 M$((
pj 7 sy, ARLINGTON, TEXAS 76012 O'% 4 /
August 15, 1979 Docket No.
50-298 Nebraska Public Power District ATTN:
J. M. Pilant, Director Licensing 6 Qaality Assorance Post Office Box 499 Columbus, Nebraska 68601 Gentlemen:
The enclosed supplecent to id Bulletin 79-14 is forwarded to yt to provide added guidance ca the intent of the IE Bulletin.
If you desire additional information regarding this matter, please contact this office.
Sincerely, Karl V. Seyfrit /
Director
Enclosures:
1.
Supplement IE Bulletin No. 79-14 2.
List of IE Bulletins Issued in the Last Six Months cc:
L. C. Lessor, Superintendent Cooper Nuclear Station Post Office Box 98 Brownville, Nebraska 68321 3' 1263 4
790907006 [
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 Supplement IE Bulletin No. 79-14 Date: August 15, 1979 Page 1 of 2 SEISMIC ANAI,YSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:
IE Bulletin No. 79-14 was issued on July 2, 1979, and revised on July 18, 1979.
The Bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants.
This supplement to the Bulletin provides additional guidance and definition of Action Items 2, 3, and 4.
To comply with the requests in IE Bulletin 79-14, it will be necessary for licensees to do the following:
2.
Inspect Part of the Accessible Piping For each system selected by the licensee in accordance with Iter 2 of the Bulletin, the licensee is expected to verify by physical inspection, to the extent practicable, that the inspection elements meet the acceptance criteria.
In performing these inspections, the licensee is expected to use measuring techniques of sufficient accuracy to demonstrate that acceptance criteria are met.
Where inspection elements important to the scismic analysis cannot be viewed because of thermal insulation or location of the piping, the licensee is expected to remove thermal insulation or provide access. Where physical inspection is not practicable, e.g., for valve weights and materials of construction, the license is expected to verify conformance by inspection of quality assurance records.
If a nonconformance is found, the licensee is expected in accordance with Item 4 of the Bulletin to perform an evaluation of the significance of the nonconformance as rapidly as possible to determine whether or not the operability of the system might be jeopardized during a safe shutdown earthquake as defined in the Regulations. This evaluation is expected to be done in two phases involving an initial engineering judgement (wit'lin 2 days), followed by an analytical engineering evaluation (within 30 days). Where either phase of the evaluation shows that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement and complete the inspections required by Item 2 and 3 of the Bulletin as soon as possible.
The licensee must report the results of these ins; me.m
_ yy. m,'
s,
ments for content and schedule as gi 1
] DUPLICATE DOCUMENT Entire document previo cred into system under:
ANO 77060$ O 3bO No. of pages:
b o,
q,
e,.
.m
_y-y,,,,
y