SG paat%
o UNITED ST ATES
,E '^
NUCLEAR REGULATORY COMMISSION G.r, j ' g. ' J
,.~.(
o REGION IV 3 f+%A a
G11 RYAN PL AZA DRIVE, SUITE 1000 U
s' t,,
+....
August 14, 1979 In Reply Refer Ic:
RIV Docket Nos.
3C-45S/IE Circular No. 79-17
%-439/IE Circular No. 79-17 Gulf Star 2s "tilities Attn:
Dr. J. C. Weigand General Manager, Nuclear Projects Post Office Sox 2951 Beaumont, Texas 77704 Gentlenen:
This IE Circular is provided as an early notification of a possible significant matter.
It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Bulletin will be issued to recommend or request specific licensee actions.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
Sincerely 7
/
/
/
/*/
//
J2
<w i.
. Seyf'rit r
Director
Enclosures:
1.
IE Circular No. 79-17 2.
List of IE Circulars Issued in the Last 6 Months on.
,.3 d ' ' r... ~ t,
790904o (,(,g
UNITED STATES NUCLEAR REGUL\\ TORY COT 1ISSION OFFICE OF INSPECTION AND ENFORCE!ENT WASHINGTON, D.C.
20555 IE Circular No. 79-17 Date:
August 14, 1979 Page 1 of 1 COD.Z FE
'1 IN 53-12 SWITCIES ON GENERAL ELECTRIC HETALCLAD CIRCUIT BPJ3 = :
The G--- 21 Electric C; pany, Switchgear Department in Philadelphia, reported to the EEC :n July 3,1979,, an intermittent contact problem in SB-12 switches.
This '
=- 'ttent contact problem will cause a lack of continuity through the "a" cents:: of the switch that is used to energize the trip coil of the circuit breaker.
Investigation disclosed that a die used to form a hole in the contact arms of the switch had worn, resulting in elongated holes.
This ccadition could permit the contact bridge member to move laterally t-lative to the contact arm, occasionally resulting in improper "a" contact wipe.
The worn die has been corrected, and all switches shipped on or after July 1, 1979, include this co r re c t. ion.
A review of the history of these components indicates that switches shipped in the time period of August 1,1978 to July 1, 1979, could have this problem.
The trip coil and auxiliary switch portion of the trip circuit is conitoret for continuity by a red light on the f ront door of the switchgear.
This light is lit.when the breaker is closed and the control circuits are energized.
If the red light is lit, this indiccces that the "a" contacts of the switch are closed, and that a trip signal will trip the breaker.
Based on the above, the licensees are advised to do the fol' lowing:
1.
Insure that all General Electric Company Metalclad Cir uit Breakers shipped to your facilities during the period from August 1, 1978 to July 1,1979 and used in or affecting the operation of safety related equipment are furnished with new SB-12 control switches as promptly as possible.
2.
Pending replacement of SB-12 control switches, administrative controls should be initiated to assure the red light which demonstrates contacc continuity, is lit and remains lit each time these circuit breakers are closed.
No written response to this circular is required.
If you require additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
D D
cv eu n
D)
L y
~
3-etr O n q ;.3 9 own.u t o Obb
_.D 7 9 o F C; 7 oc2 7 )
IE Circular No. 79-17 August 14, 1979 LISTING OF IE CIRCULARS ISSUED IN LAST SIX MONTHS t ~ "- --
S ubj ect Date of Issued To No.
Issue 79-03 Inadequate Guard 2/23/79 All Holders of and Training - Qualifica-applicants for Special tion and Falsified Nuclear Material Licenses Training Records in Safeguards Group I 79-04 Loose Locking Nut 3/16/79 All Holders of Reactor On Limitorque Valve Operating License (OL) or Operators Construction Permits (CP) 79-05 Moisture Leakage in 3/20/79 All Holders of Reactor Stranded Wire Conductors Operating License (OL) or Construction Permits (CP) 79-06 Failure to Use Syringe 4/19/79 All Holders of Medical and Battle Shields in Licensees except Teletherapy Nuclear Medicine Licensees 79-07 Unexpected Speed Increase 5/2/79 All Holders of BWR Operating of Reactor Recirculation Licenses (OLs) or Construc-MG Set Resulted in Reactor tion Permits (cps)
Power Increase 79-08 Attempted Extortion - Low 5/18/79 All Fuel Facilities and Enriched Uranium Reactors Licensed by NRC 79-09 Occurrences of Split or 6/22/79 All Materials Priority I, Punctured Regulator Fuel Cycle and Operating Diaphragas in Certain Reactor Licenses (OL)
Self Contained Breathir.g Apparatus 79-10 Pipefittings Manufactured 6/26/79 All Power Reactor Licensees f raa Unacceptable Material with, a Cons truction Permit __
and/or Operating License (OL) 79-11 Design / Construction 6/27/79 All Holders of and Applicants Interface Problem for Power Reactor Construction Permits (CP)
D r? nn D)
Enclosure
.,,((
Page 1 of 2 hi o A)
_ loj
_ i g
_a ca.n u
IE Circular No. 79-17 August 14, 1979 79-12 Potential Eiesel Generator 6/28/79 All Power Reactor Licensee with Turbocharger Problem a Construction Permit (CP) and/or Operating License (OL) 79-12 Replac=---* cf Diesel 7/13/79 All Power Reactor Licensee Fire Purp Starting with a Construction Permit Contacters (CP) and/or Operating Licensee (OL) 79-14 Unauthorized Procurement 7/13/79 All Medical Licensees and Distribution of Except Teletheraphy IE-133 Medical Licensees and to all Radiopharmaceutical Suppliers 79-15 Bursting of High Pressure 8/8/79 All Materials Priority I, Hose and Malfunction of Fuel Cycle and Operating Relief Valve "0" Ring in Power Reactor Licensees Certain Self-contained Breathing Apparatus 79-16 Excessive Radiation 8/16/79 All Radiography Exposures to Members Licensees of the General Public and a Radiographer Enclosure Page 2 of 2 I