Forwards IE Insp Repts 50-456/79-06 & 50-457/79-06 on 790503 & Notice of Deviation
ML19249B653
Person / Time
Site: Braidwood  
Issue date: 06/01/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19249B654 List:
References
NUDOCS 7909040638
Download: ML19249B653 (2)


See also: IR 05000456/1979006

Text

TlC

.

p *Eco

UNITED STATES

p

7

0

7

, . ,

NUCLEAR REGULATORY COMMISSION

[

"a , i{[(i

o

REGloN lli

,

S'

'g

' f

799 POOSEVELT RO AD

O

E

GLEN ELLYN, ILLtNoIS 60137

  • % * . . . r*

..

'?

JWR f

1979

_

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison

Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. E. R. Schweibinz

and C. E. Jones of this office, on May 3, 1979, of activities at

Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC

Construction Permits No. CPPR-132 and No. CPPR-133 and to the dis-

cussion of our findings with Mr. Cosaro, Mr. Homoly and others of

the Braidwood staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

Certain other activities, set forth in the enclosed Appendix A to

this letter, appear to be a deviation from commitments which you

have made in previous correspondence with the Commission.

Please

advise us in writing within thirty days of the corrective action you

have taken or plan to take, showing the estimated date of completion

with regard to this deviation.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows.

If the

enclosures contain information that you or your contractors believe

to be proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such infor-

mation from public disclosure. The application must include a full

statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

-v:%;v :r2

-

%

J %

790E004 o d$:3<9, P

.

.

JUN}

1979

Commonwealth Edison

-2-

Company

'

We will gladly discuss any questions you have concerning this

inspection.

,

Sincerely,

.

f

'

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice

of Deviation

2. IE Inspection Reports

No. 50-456/79-06 and

No. 50-457/79-06

cc w/encls:

Mr. R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General