Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required
ML19249B338
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/14/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 7909040296
Download: ML19249B338 (1)


Text

CENTRAL FILES e met,,k UNITED STATES PDR:HQ p

[ %,.cy'j NUCLE AR REGULATORY COMMISSION

%, iV,-

E REGION IV

,IbIC S ' 'i

/[

611 RYAN PLAZA DRIVE, SUITE 1000

%,, ' ' /

cf AR LING TON, T E X AS 76012 August 14, 1979 Docket Nos.

50-313 50-368 Arkansas Power and Light Company ATTN: E. Willian Cavanaugh III Vice President of Generation and Construction P. O. Eox 551 Little Rock, Arkansas 72203 Gentlecen:

With this IE Information Notice the Nuclear Regulatory Cocaission is extending an existing mechanism previously used for informing facility licensees of significant operating events to include informing operator licensees of significant events which could impact on conditions of their NRC licenses.

It is requested that the f acility licensee provide copies of this IE Information Notica to all NRC licerised individuals at the facility.

No specific response is requested at this time.

If you have questions regarding this matter please contact the Director of the appropriate NRC Regional Office.

Sincerely,

[l

<.qd/,,, I e

c brlV.Seyrit Director

Enclosures:

1.

IE Information Notice No. 79-20 2.

List of IE Information Notices Issued in 1979 cc: James P. O' Hanlon, Plant Manager Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 g3 7 p,

aw.-~>-

7009040 2Pg P

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 IE Information Notice No. 79-20 Date:

August 14, 1979 Page 1 of 3 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS

Background:

In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.

These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures.

Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.

The purpose of this Information Notice is two-fold:

1.

To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility administrative procedures; and 2.

To summarize the enforcement sanctions available to the NRC for use against licensed individuals.

Description of Circumstances:

1.

Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected.

The role of NRC licensed individuals is no less important in the overall Regulatory scheme.

The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety.

Reliance on these actions is a part of the defense-in-depth concept.

Specifically, the NRC requires that:

(1) Only licensed operators are permitted to manipulate the controls that directly affect reactivity (10 CFR 50.54(i))

(2) Licensed operators are required to be present at the controls at all times during the operation ;w~

A

- ma -.

n.

] DUPLICATE DOCU. VENT 30$j[Q

]

A 1 Entire document previously entered 9)

)into system under-1 7l k

T1NO

$0E09 02(oO f

4

J d

No. of pages:

[_9 li I

g

--<w