ML19249B269
| ML19249B269 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/09/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19249B270 | List: |
| References | |
| NUDOCS 7909040214 | |
| Download: ML19249B269 (2) | |
See also: IR 05000329/1979016
Text
[ga arc g#'o
,
UNITE D ST ATES
l '"
NUCLEAR REGULATORY COMMISSION
s
? c!
,' .' %
C
$
REGION lli
a-
'o, k QI
f
799 ROOSEVE LT HOAD
GLEN E LLYN tLLINOIS 60137
'%,
j
- ....
JUL 9
1979
Docket No. 50-329
Docket No. 50-330
Consu2ners Power Company
ATTN:
Mr. Stephen H. Howell
Vice President
1945 West Parnall Road
Jackson, MI 49201
Gentlemen:
This refers to the inspection conducted by Mr. R. J. Cook of this ,ffice
during the period of May 1-31, 1979, of at activities at the Midland
Nuclear Power Plant construction site authorized by hTC Construction
Permits No. CPPR-81 and CPPR-82 and to the discussion of our findings
with Messrs. T. C. Cooke, J. L. Corley, and others of your staff at the
conclusion of the inspection.
The enclased copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records, observations,
and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the h7C's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the application.
c a e o n )
O U ) t.1 l =
9 040
.
UUb 0
I379
Consumers Power Company
-2-
,
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
~
P.AlW~
s
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-329/79-16
and No. 50-330/79-16
cc w/ encl:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan
Public Service Commission
Dr. Wayne E. North
Myron M. Cherry, Chicago
noens
O U .a. O s.