ML19249B229

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/79-10 & 50-499/79-10 on 790612-15.No Noncompliance Noted
ML19249B229
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/27/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19249B230 List:
References
NUDOCS 7909040140
Download: ML19249B229 (2)


See also: IR 05000498/1979010

Text

7Ec-

pH M Cg .

o

UNITED STATES

$,y[W [Jc

E'

NUCLEAR REGULATORY COMMISSION

,.

E

REGION IV

S.

[

611 RYAN PLAZA DRIVE,SulTE 1000

\\

'~

d

ARLINGTON, TEXAS 76012

      • .*

June 27, 1979

In Reply Refer To:

RIV

Docket No. 50-498/Rpt. 79-10

50-499/Rpt. 79-10

Houston Lighting and Power Cocpany

ATIN:

Mr. E. A. Turner, Vice President

Power Plant Ccnstruction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Gentlecen:

This refers to the inspection conducted by Mr. W. G. Hubacek of our staff

during the period June 12-15, 1979, of activities authorized by URC

Construction Permit Nos. CPPR-128 and 129 for South Texas Project, Units No.

1 and 2, and to the discussion of our findings with Mr. L. D. Wilson and

other members of your staff at the conclusion of the inspection.

Areas exanined during.the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

We have also exanined actions you have taken with regard to previously identi-

fled inspection findings.

The status of these items is identified in paragraph

2 of the enclosed report.

One new unresolved item is identified in paragraph 4 of the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this of fice, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application cust include a full statement of the reasons

why it is claited that the information is proprietary.

Thc application should

7909 040/ <(o.

~, , m

.~

.

.

Houston Lighting and Power Company

-2-

June 27, 1979

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

'

M,

-

W. C. Sei

, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-498/79-10

50-499/79-10

--

3G1130