Forwards IE Insp Rept 50-366/79-23 on 790530-0601.No Noncompliance Noted
ML19249B171
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/03/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19249B172 List:
References
NUDOCS 7909040036
Download: ML19249B171 (2)


See also: IR 05000366/1979023

Text

.

b

a asc

  1. ,e

oq'o

UNITED STATES

!'?,,, 'k

NUCLEAR REGULATORY COMMISSION

k@'-'

REGION 11

s

f

101 M ARIETT A ST , N.W., SulTE 3100

o,

ATL ANT A, G E oRGI A 303o3

...../

6

v

q

In Reply Refer To:

RII:DGH

50-366/79-23

yl

3 1979

Georgia Power Company

Atta:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by D. G. Hinckley of this office

on May 30 through June 1,1979 of activities authorized by NRC License

No. NPF-5 for the E. I. Hatch facility, Unit 2, and to the discussion of

our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

clained that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

-

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

900330

7909040 636

.

.

JUL

3 7979

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

0%

,

R. C. i.ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-366/79-23

cc w/ enclosure:

M. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor