ML19249A786

From kanterella
Jump to navigation Jump to search
Forwards LER 79-053/03L-0
Date released: 09/20/2019 Download: ML19249A786


Ler 79-053/03L-0 on 790801:during Surveillance Procedure HNP-1-3001,high Reactor Pressure Trip Switch B21-N023B Actuated at 1075 Psig.Caused by Setpoint Drift.Switch Recalibr & Functional Test Successfully Completed
ML19249A794
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/17/1979
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249A794 (1)
Forwards LER 79-053/03L-0
ML19249A784
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/17/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249A784 (1)