Text
/
- pn Mar
/
'o UNITED STATES 8 \\*
', 7.
)
(
NUCLEAR REGULATORY' COMMISSION WASHINGTON, D. C. 20555 -
%w y TEfiflESSEEVALLEYAUiHORITY DOCKET fl05. STfl 50-553 AfiD STil 50-5_54 PHIPPS BEhD NUCLEAR PLANT, UNITS 1 AND 2 Af1ENDMENT TO CONSTRUCTION PERMIT Amendment flo.1 Construction Permit No. CPPP-162 The fluclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the permittee) dated January 3, 1979 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The issuance of this amendment will not be inimical to the connon defense and security or to the health uad safety of the public; and C.
The issuance of this amendment is in -ctordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
D.
Accordingly, the Nuclear Regulatory Conmission has issued Amendment f!o.1 to Construction Permit flo. CPPR-162.
The amendment changes the commi+ments and requireuents specified in Appendix
,s of CPPR-162 and in the Final Environmental Statement as follows:
1.
Construction Permit Appendix A, p. 3, item 23; FES Section 4.5.1.1,
- p. 4-14, item 23; FES Section 5.6.1, p. 5-30.
Change to-Tordon 101 will be used at the rate of 10 lbs/ acre which is within the present EPA allowSu e limits, or similar approved herbicides will be used within the limits estalvished by EPA.
2.
Construction Permit Appendix A, p. 3, item 8; FES Section 4.5.1.2,
" 15, item 8.
Change to-All potentially hazardous wastes will be handled and stored in accordance with applicable regulations to ensure the protection of the employees, public, and environ-ment. These wastes will be collected and trans?ortea to an approved disposal facility by a qualified solid wasta management contractor or by TVA in accordance with applicable laws and regulations.
_,/ J S
g nos2400S M
-2_
3.
FES Section 4.1.3.1, p. 4-3, first complete paragraph, second
- entence.
Change to-Revegetation efforts in rights-of-way will include the establishment of grasses (especially fescue) and other wildlife food and cover (ER Sections 4.3.2, 4.3.8, Appendix fil, and Questfons 4.9 and 4.41 of Supplement 1).
4.
FES Section 4.1.3.1, p. 4-4, first complete paragraph, seventh sentence.
Change to-After the location of the rights-of-way have been determined, TVA biologists will review any deviations in the route, by helicoptei, not previously assessed in the initial survey to determine if field surveys of any identified sensitive areas are warranted.
5.
FES p. 6-5, first paragraph.
Change to-Ground w. er nonitoring will not be conducted during the construction ph.se.
This amendment is effective as of the date of issuance.
FOR Ti!E fiUCLEAR REGULATORY COMMISSION
/ /
n,
f /, h o. 2 & W ~~
Domenic B. Vassallo, Acting Director Division of Project Management late of Issuance: AUGG 1979 V4
,sn I
6
,j
pn nico
'o UNITED STATES 5 %.,
' 7, E
NUCLEAR REGULATORY COMMISSION dA WA5mNGTON, D. C. 20555 k h2,IU gx*../
TETf1ESSEE VALLEY AUTHORITY DOCKET I05. STfl 50-553 Af1D STfl 50-554 PHIPPS BEriD fiUCLEAR PLAT 1T, UtlITS 1 Af;D 2 AfiEf;DMEf1T TO C0f;STRUCTI0fi PERMIT knendment Io. 1 Construction Per.ii t tio. CPPR 163 The I;uclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the permittee) dated January 3, 1979 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comnission's rules and regulations set Porth in 10 CFR Chapter I; B.
The issuance of '.his amendment will not be inimical to the commor, defense and seo r ty or to the health and safety of the public; r.nd C.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Ccamission's regulations and all applicable requirements have been satisfied.
D.
Accordingly, the fluclear Regulatory Ccomission has issued Amendment flo. I to Construction Permit flo. CPPR-163.
The amendment changes the commitments and requirements specified in Appendix A of CPPR-163 and in the Final Environmental Statement as follows:
1.
Construction Permit Appendix A, p. 3, iten 23; FES Section 4.5.1.1,
- p. 4-14, item 23; FES Section 5.6.1, p. 5-30.
Change to-Tordon 101 will be used at the rate of 10 lbs/ acre which is within the present EPA allowable limits, or similar approved herbicides will be used within the limits established by EPA.
2.
Construction Permit Appendix A, p. 3, item 8; FES Section 4.5.1.2,
- p. 4-15, i tem 8.
Change to-All potentially hazardous wastes will be handled and stored in accordance with applicable regulations to ensure the protection of the employces, public, and environ-ment.
These wastes will be collected and transported to an approved disposal facility by a qualified solid waste management contractor or by TVA in accordance with applicable laws and regulations.
7,
,}j 7908320-c:08240 2 '1 3.
FES Section 4.1.3.1, p. 4-3, first complete paragraph, second sentence.
Change to-Revegetation efforts in rights-of-way will include the establishment of grasses (especially fescue) and other wildlife food and cover (ER Sections 4.3.2, 4.3.8, Appendix fil, and Questions 4.9 and 4.41 of Supplement 1).
4.
FES Section 4.1.3.1, p. 4-4, first complete paragraph, seventh sentence.
Change to-After the location of the rights-of-way have been determined, TVA biologists will review any deviations in the route, by helicopter, not previously assessed in the initial survey to determine if field surveys of any identified sensitive areas are warranted.
5.
FES p. 6-5, first paragraph.
Change to-Ground water monitoring will not be conducted during the construction phase.
This amendment is effective as of the date of issuance.
c0R THE fiUCLE/rt REGULATORY COMMISSIO'i
)
/,J.:Af s Cd Domenic B. Vassallo, Acting Director Division of Project Management Date of Issuance:
AUG 6 G79