ML19248D502
| ML19248D502 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/12/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19248D498 | List: |
| References | |
| NUDOCS 7908160338 | |
| Download: ML19248D502 (2) | |
See also: IR 05000424/1979012
Text
pa atoo
- M
'
o
UNITED STATES
.
.
I
8' , y, g
'n
NUCLEAR REGULATORY COMMISSION
5
1,r . E
REGION 11
D,
yl
[
101 MARIETT A sT., N W., SUIT E 3100
\\
.b." [
ATL ANT A, G E oRGI A 30303
- ..+
In Reply Refer To:
RII:MDH
50-424/79-12
50-425/79-12
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia
30303
Gentlemen:
This refers to the inspection conducted by M. D. Hunt of this office on June 19-22,
1979, of activities authorized by NRC Construction Permit Nos. CPPR-108 and
CPPR-109 for the Vogtle Nuclear Plant, Units 1 and 2 facilities, and to the
discussion of our findings held with H. H. Gregory, III at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Ofj!)138
7908160 %
JUL . z 1979
.
.
.
Georgia Power Company
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
- -I
C. E. Hur hy,
hief
~
Reactor Constructi
and
ingineering Support Branch
Enclosure:
Inspection Report Nos.
50-424/79-12 and 50-425/79-12
cc w/cacl:
K. M. Gillespie
Construction Project Manager
Post Office Box 282
Waynesboro, Georgia
30830
E. D. Groover
QA Site Supervisor
Post Office Box 282
Waynesboro, Georgia
30830
bd C.[.ij.'l