Text

pa atoo

  • M

'

o

UNITED STATES

.

.

I

8' , y, g

'n

NUCLEAR REGULATORY COMMISSION

5

1,r . E

REGION 11

D,

yl

[

101 MARIETT A sT., N W., SUIT E 3100

\\

.b." [

ATL ANT A, G E oRGI A 30303

  • ..+

In Reply Refer To:

RII:MDH

50-424/79-12

50-425/79-12

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia

30303

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on June 19-22,

1979, of activities authorized by NRC Construction Permit Nos. CPPR-108 and

CPPR-109 for the Vogtle Nuclear Plant, Units 1 and 2 facilities, and to the

discussion of our findings held with H. H. Gregory, III at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Ofj!)138

7908160 %

JUL . z 1979

.

.

.

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

  • -I

C. E. Hur hy,

hief

~

Reactor Constructi

and

ingineering Support Branch

Enclosure:

Inspection Report Nos.

50-424/79-12 and 50-425/79-12

cc w/cacl:

K. M. Gillespie

Construction Project Manager

Post Office Box 282

Waynesboro, Georgia

30830

E. D. Groover

QA Site Supervisor

Post Office Box 282

Waynesboro, Georgia

30830

bd C.[.ij.'l