Text
%
'
enn
s
'c,
UNITED STATES
8
fi
NUCLE AR REGUL ATORY COMMISSION
$.d'5
,
REGION 11
gkh
f
101 M ARIE TTA sT., N W , s'ilT E 3100
f
- ...<
In Reply Refer To:
JUN 2 01979
RII:PKV
50-395/79-16
South Carolina Electric and Gas Company
Attn:
M. C. Johnson, Vice President
Special Services and Purchasing
Post Office Box 764
Columbia, South Carolina 29218
Gentlemen:
This refers to the inspection conducted by P. K. Van Doorn of this
office on May 21-24, 1979 of actisities authorized by NRC Construction
Permit No. CPPR-94 for the V.
C. Summer Nuclear Station facility, Unit 1,
and to the discussion of our finm ngs held with D. A. Nauman at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
re;ords, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title
Code of Federal Regulations, a copy of this letter and
the enclosed
ection report will be placed in the NRC's Public
s
Dccument Room
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimec that the inf ormation is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
7 9 0 s y g 033 f
M.3
1
- eg
.
JUN 2 01979
'
South Carolina Electric aad
Gas Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
,
r r's': / /.
./ '
- -
.
^
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
Inspection Report No. 50-395/79-16
cc w/ enclosure:
T. B. Conners, Jr.
Conners, Moore and Corber
1747 Pennsylvania Avenue, N.W.
Washington, D.C.
20006
A. A. Smith
Quality Assurance
Post Office Box 8
Jenkinsville, South Carolina 29065
0. S. Bradham, Manager
Nuclear Operations
Post Gffice Box 8
Jenkiasville, South Carolina 29065
6)n p r. A.;; 1' .
-