| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19248D480 | List: |
| References | |
| NUDOCS 7908160319 | |
| Download: ML19248D486 (2) | |
See also: IR 05000321/1979019
Text
.
.
pa af og'o
UNITED STATES
+
!'
g,j
NUCLEAR REGULATORY COMMISSION
'
.y
RFGION 11
- /' '7,d/
c
o,
h
[
101 MARIE TT A sT., N W., SUIT E 310o
'%/
AT L ANT A, G EoRGI A 30303
...../
JUL 0 91979
In Reply Refer To:
RII:CMH
50-321/79-19
50-366/79-24
.
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia
30303
Gentlemen:
This refers to the inspection conducted by C. M. Josey of this office on June 18-22,
1979, of activities authorized by NRC Operating License Nos. DPR-57 and NPF-5
for the Hatch facility, and to the discussion of our findings held with W. H. Rogers
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is eecessary that you make a written application within 20 days
to this of fice to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Y,
/
Y at
/ J. T. Sutherland, Chief
(2)O139
Fuel Facility and Materials
Safety Branch
C.
'7008160
/
JUL 0 91979
.
.
-
'
Georgia Power Company
-2-
Enclosure:
Inspection Report Nos.
50-321/79-19 and 50-366/79-24
cc w/ enc 1:
M. Manry, Plant Manager
P. O. Box ~442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
63E10