EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602 Rev. 6 ATTACHMENT 5 Page 1 of 4
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Screening and Evaluation Number Applicable Sites EREG #: _02279023____________________
BNP CNS CR3 HNP 5AD #: __02278955_________________
MNS ONS RNP GO Document and Revision Emergency Plan Section H 19-01 Part I. Description of Proposed Change:
Change #
Plan Section Current Revision Proposed Revision Reason 5
Section H Figure H-2 Old OSC Layout New OSC Layout Replaced OSC Layout drawing with new layout.
, 10 CFR 50.54(q) Initiating Condition (IC) and Emergency Action Level (EAL) and EAL Bases Validation and Verification (V&V) Form, is attached (required for IC or EAL change)
Yes No Part II. Description and Review of Licensing Basis Affected by the Proposed Change:
Licensing Basis McGuire Emergency Plan Change 2 (dated February 13, 1981)
Current Emergency Plan Emergency Plan, Revision 18-3 Part Ill. Description of How the Proposed Change Complies with Regulation and Commitments.
If the emergency plan, modified as proposed, no longer complies with planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50, then ensure the change is rejected, modified, or processed as an exemption request under 10 CFR 50.12, Specific Exemptions, rather than under 10 CFR 50.54(q):
Change 5 - Replaces Section H Figure H-2 (OSC Layout) drawing with new layout. The new drawing depicts new furniture layout for the OSC. Adequate facilities continue to be maintained in the OSC to support emergency response. Thus, the Emergency Plans will continue to comply with 10 CFR 50.47(b)(8) - Emergency Facilities and Equipment and 10 CFR Part 50 Appendix E - Emergency Facilities and Equipment.
The differences in approved revisions and the current revisions of the Emergency Plans have been reviewed, and they have been determined to continue to meet NRC requirements as described in 10 CFR 50.47(b) and 10 CFR 50, Appendix E during the course of revisions.
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602 Rev. 6 ATTACHMENT 5 Page 2 of 4
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change (Address each function identified in Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV of associated Screen):
10CFR50.47(b)(8) - Emergency Facilities and Equipment)
Adequate emergency facilities and equipment to support the emergency response are provided and maintained.
10CFR50 Appendix E.IV.E. Emergency Facilities and Equipment Adequate provisions shall be made and described for emergency facilities and equipment, including:
8.a. (i) A licensee onsite technical support center and an emergency operations facility from which effective direction can be given and effective control can be exercised during an emergency; (ii) For nuclear power reactor licensees, a licensee onsite operational support center; The associated EP Functions is Function 8a, Adequate facilities are maintained to support emergency response.
Program Elements NUREG-0654 -
Section II.H. - Emergency Facility and Equipment
- 1. Each licensee shall establish a Technical Support Center and an onsite operations support center (assembly area) in accordance with NUREG-0696, Revision 1.
Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions:
Change 5 - Replaces Section H Figure H-2 (OSC Layout) drawing with new layout. The new drawing depicts new furniture layout for the OSC. Adequate facilities continue to be maintained in the OSC to support emergency response.
The changes described provide assurance that the normal plant operating organization and ERO has the ability and capability to:
respond to an emergency; perform functions in a timely manner; effectively identify and take measures to ensure protection of the public health and safety; and effectively use response equipment and emergency response procedures.
The changes described do not reduce the effectiveness of the McGuire Nuclear Station Emergency Plan, as written and approved; and continue to meet NRC requirements, as described in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602 Rev. 6 ATTACHMENT 5 Page 3 of 4
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Part VI. Evaluation Conclusion.
Answer the following questions about the proposed change.
1 Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E?
Yes No 2
Does the proposed change maintain the effectiveness of the emergency plan (i.e., no reduction in effectiveness)?
Yes No 3
Does the proposed change maintain the current Emergency Action Level (EAL) scheme?
Yes No 4
Choose one of the following conclusions:
a The activity does continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E, and the activity does not constitute a reduction in effectiveness or change in the current Emergency Action Level (EAL) scheme. Therefore, the activity can be implemented without prior NRC approval.
b The activity does not continue to comply with the requirements of 10 CFR 50.47(b) or 10 CFR 50 Appendix E or the activity does constitute a reduction in effectiveness or EAL scheme change.
Therefore, the activity cannot be implemented without prior NRC approval.
Part VII. Disposition of Proposed Change Requiring Prior NRC Approval Will the proposed change determined to require prior NRC approval be either revised or rejected?
Yes No If No, then initiate a License Amendment Request in accordance 10 CFR 50.90, AD-LS-ALL-0002, Regulatory Correspondence, and AD-LS-ALL-0015, License Amendment Request and Changes to SLC, TRM, and TS Bases, and include the tracking number:__________________________________________________.
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602 Rev. 6 ATTACHMENT 5 Page 4 of 4
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Part VIII. Signatures: EP CFAM Final Approval is required for changes affecting risk significant planning standard 10 CFR 50.47(b)(4) (i.e., Emergency Action Levels and Emergency Action Level Bases). If CFAM approval is NOT required, then mark the CFAM signature block as not applicable (N/A) to indicate that signature is not required.
Preparer Name (Print): Barry Kimray Preparer Signature: See CAS Date:
See CAS Reviewer Name (Print): See CAS Reviewer Signature: See CAS Date:
See CAS Approver (Manager, Nuclear Support Services) Name (Print): See CAS Approver Signature: See CAS Date:
See CAS Approver (EP CFAM, as required) Name (Print):
See CAS Approver Signature: See CAS Date:
See CAS If the proposed activity is a change to the E-Plan, then initiate PRRs.
If the proposed activity is a change to the E-Plan, then create two EREG General Assignments.
If required by Section 5.6, Submitting Reports of Changes to the NRC, then create two EREG General Assignments.
One for EP to provide the 10 CFR 50.54(q) summary of the analysis, or the completed 10 CFR 50.54(q),
to Licensing.
One for Licensing to submit the 10 CFR 50.54(q) information to the NRC within 30 days after the change is put in effect.
QA RECORD